Back to bathroom remodel contractors
Niland Builders
- Based in
- Burlingame
- On San Francisco permits
- Mar 2010 to Mar 2025
- Last 24 months
- 1 permit filed
27 permits since 2000: 20 completed, 2 in progress, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 in progress, 1 never finaled. Typically 14 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2025 | Completed final sign-off May 2026 | 41 Clairview Ct | upper fl - add half bath; reconstruct (e) stairs; lower fl - add studio, primary bed and primary bath, laundryDetails
upper fl - add half bath; reconstruct (e) stairs; lower fl - add studio, primary bed and primary bath, laundry | $100,000 |
| Jun 28, 2024 | In progress issued Jun 2024 | 41 Clairview Ct | remodel kitchen and 2 baths in kindDetails
remodel kitchen and 2 baths in kind | $35,000 |
| Jul 30, 2021 | Never finaled issued Aug 2021, no final | 1736 Fell St | comply with nov #2017-09351 & #201840231. remodel all three existing units, kitchen and bath. all exterior door & windows to be repaired. repair collapse (back) stairs 50%.Details
comply with nov #2017-09351 & #201840231. remodel all three existing units, kitchen and bath. all exterior door & windows to be repaired. repair collapse (back) stairs 50%. | $220,000 |
| Feb 8, 2021 | Completed final sign-off Feb 2022 | 100 Shawnee Av | remodel/convert ground floor to habitable space. add 814 sqft with 2 bedroom & 2 bathrooms. replace 2 windows with sliding doors at rear elevation. add 1 bedroom window at side elevation.Details
remodel/convert ground floor to habitable space. add 814 sqft with 2 bedroom & 2 bathrooms. replace 2 windows with sliding doors at rear elevation. add 1 bedroom window at side elevation. | $70,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 658 Cayuga Av | add one bedroom, wic, one full bath, one powder room & one office on 1st fl.Details
add one bedroom, wic, one full bath, one powder room & one office on 1st fl. | $40,000 |
| Jan 8, 2020 | Completed final sign-off Feb 2022 | 100 Shawnee Av | renovation of (e) sfd. remodel kitchen & (e) bath. add half bath. remove (e) lightwell to add 9sf of habitable space. replace 4 windows. no modification to foot print or height. no work at ground fl.Details
renovation of (e) sfd. remodel kitchen & (e) bath. add half bath. remove (e) lightwell to add 9sf of habitable space. replace 4 windows. no modification to foot print or height. no work at ground fl. | $50,000 |
| Mar 29, 2017 | Completed final sign-off Aug 2017 | 1025 Lombard St | install new cabinets in kitchen and bathroom. add a new closet in bedroom and desk area in living room. add some 4" led recessed lights.Details
install new cabinets in kitchen and bathroom. add a new closet in bedroom and desk area in living room. add some 4" led recessed lights. | $60,000 |
| Jun 27, 2014 | Completed final sign-off Oct 2014 | 654 Cayuga Av | convert e space on 1st floor to have a family room, storage, full bath, for single family useDetails
convert e space on 1st floor to have a family room, storage, full bath, for single family use | $48,000 |
| Mar 23, 2011 | Completed final sign-off Aug 2011 | 654 Cayuga Av | install new tile, toilet, sink in bathroom. shower also. remodel kitchen, new electrical, new cabinets, new plumbing lines. new flooring. not moving or adding wallsDetails
install new tile, toilet, sink in bathroom. shower also. remodel kitchen, new electrical, new cabinets, new plumbing lines. new flooring. not moving or adding walls | $30,000 |
| Feb 24, 2011 | Completed final sign-off Jun 2011 | 45 Sequoia Wy | additional work to 201011245628. sheetrock living room, 2 bedrooms, 2nd fl. remodel bath, fixtures same location. tile. type x 5/8 " and insulation r-13 walls, r-30 atticDetails
additional work to 201011245628. sheetrock living room, 2 bedrooms, 2nd fl. remodel bath, fixtures same location. tile. type x 5/8 " and insulation r-13 walls, r-30 attic | $7,000 |
| Nov 24, 2010 | Completed final sign-off Jun 2011 | 45 Sequoia Wy | fill in ligthwell to extend kitchen on 2nd floor. build new family, bedroom and full bath room in garage area and leave 10' x 20' for parking on 1st/garage floorDetails
fill in ligthwell to extend kitchen on 2nd floor. build new family, bedroom and full bath room in garage area and leave 10' x 20' for parking on 1st/garage floor | $50,000 |