Back to bathroom remodel contractors
Nicotim Construction
- Based in
- Daly City
- On San Francisco permits
- Nov 2017 to Dec 2024
- Last 24 months
- 1 permit filed
18 permits since 2000: 17 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 8 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2024 | Completed final sign-off Mar 2025 | 1319 Lyon St | kitchen and bath remodel on upper level. create master bedroom with bathroom for upper level. create new bar at lower level. new electrical wiring for entire house. new plumbing for new master bath and laundry room.Details
kitchen and bath remodel on upper level. create master bedroom with bathroom for upper level. create new bar at lower level. new electrical wiring for entire house. new plumbing for new master bath and laundry room. | $85,000 |
| Jan 26, 2024 | Completed final sign-off Apr 2024 | 3100 Rivera St | 2/f: unpermitted half bath conversion to be legalized, 1/f: unpermited dry bar/bar sink to be legalized, 2/f: conversion of dining room to be bedroom (n) #5.Details
2/f: unpermitted half bath conversion to be legalized, 1/f: unpermited dry bar/bar sink to be legalized, 2/f: conversion of dining room to be bedroom (n) #5. | $30,000 |
| Sep 13, 2023 | Completed final sign-off Nov 2023 | 2790 19th Av | partial bathroom remodel. remove and replace shower and shower pan, valve, toilet, tile, bathroom fan and lighting. existing vanity to remain. non structural work.Details
partial bathroom remodel. remove and replace shower and shower pan, valve, toilet, tile, bathroom fan and lighting. existing vanity to remain. non structural work. | $7,000 |
| Feb 13, 2023 | Completed final sign-off Jul 2023 | 1450 10th Av | repair 1 kitchen: cabinets, countortop, tiles, repair 1 bathroom bathtub and tiles add electrical outlets, litghts, and swithes (upper level)Details
repair 1 kitchen: cabinets, countortop, tiles, repair 1 bathroom bathtub and tiles add electrical outlets, litghts, and swithes (upper level) | $28,000 |
| Feb 7, 2023 | Completed final sign-off Dec 2023 | 102 Webster St | remodel existing kitchen bathroom and laundry room. add (1) new skylight. replace (e) door and window with new double french door at rear wall, not visible from the streetDetails
remodel existing kitchen bathroom and laundry room. add (1) new skylight. replace (e) door and window with new double french door at rear wall, not visible from the street | $45,000 |
| Mar 8, 2022 | Completed final sign-off Aug 2022 | 95 Ina Ct | revision to pa 2021-1012-0241 window size @ ground fl and 2nd fl; replace tub with a shower on ground floor bathroom; replace (n) sliding door with (n) french door @ rear wall; moving the wet bar on the ground floor.Details
revision to pa 2021-1012-0241 window size @ ground fl and 2nd fl; replace tub with a shower on ground floor bathroom; replace (n) sliding door with (n) french door @ rear wall; moving the wet bar on the ground floor. | $4,000 |
| Oct 12, 2021 | Completed final sign-off Jul 2022 | 95 Ina Ct | remodel & convert ground floor into habitable space 710 sf add new bedroom & family room & full bath. add interior stairs, add (4) windows on property line. doing voluntary strengthening on the ground floor by adding plywood shear walls.Details
remodel & convert ground floor into habitable space 710 sf add new bedroom & family room & full bath. add interior stairs, add (4) windows on property line. doing voluntary strengthening on the ground floor by adding plywood shear walls. | $120,000 |
| Aug 5, 2019 | Completed final sign-off Nov 2019 | 727 41st Av | (e) bathroom to be relocated per plans, floors and ceiling patch to match (e) utilities to be reworked/requiredDetails
(e) bathroom to be relocated per plans, floors and ceiling patch to match (e) utilities to be reworked/required | $24,000 |
| Feb 13, 2019 | Completed final sign-off Nov 2019 | 5150 Diamond Heights Bl | upgrade bathroom and kitchen, new cabinets and countertop.Details
upgrade bathroom and kitchen, new cabinets and countertop. | $25,000 |
| Oct 10, 2018 | Completed final sign-off Mar 2019 | 60 Juanita Wy | remodel kitchen: replce all fixtures, caibnerts and finsiehs. no walls modified. bathroom remodel: replace tiles, tub, no walls modified.Details
remodel kitchen: replce all fixtures, caibnerts and finsiehs. no walls modified. bathroom remodel: replace tiles, tub, no walls modified. | $30,000 |
| Mar 29, 2018 | Completed final sign-off Aug 2018 | 727 41st Av | 941 sq ft interior remodel: add new bath, replace extg windows at lightwell, remodel extg kitchen and extg bath, add new skylight, garage door replacement.Details
941 sq ft interior remodel: add new bath, replace extg windows at lightwell, remodel extg kitchen and extg bath, add new skylight, garage door replacement. | $120,000 |
| Nov 9, 2017 | Completed final sign-off Apr 2020 | 176 Ramsell St | new 2-story addition at the back (2 bedrooms and 2 bathrooms). new 10' opening at kitchen/living room, interior remodel new main door. relocate and replace water heater, new furnace and new 1/2 bath.Details
new 2-story addition at the back (2 bedrooms and 2 bathrooms). new 10' opening at kitchen/living room, interior remodel new main door. relocate and replace water heater, new furnace and new 1/2 bath. | $95,000 |