Nick Trigonis
- Based in
- Martinez
- On San Francisco permits
- Sep 2007 to Mar 2008
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2008 | Completed final sign-off May 2008 | 4150 Cesar Chavez St | install tar paper on top of redwood exterior wall siding & vinyl alcoa brand siding on left side of building, 180 sf , 6 ft high above adjacent roof.Details
install tar paper on top of redwood exterior wall siding & vinyl alcoa brand siding on left side of building, 180 sf , 6 ft high above adjacent roof. | $2,000 |
| Sep 5, 2007 | Completed final sign-off Sep 2007 | 858 33rd Av | remove old cabinets in 1 kichen and install new ones with 2 new circuits for outlets and new circuit for dishwasher and garbage disposal to meet code. also install six 26 watt florescent ceiling lights to meet code. also install new granite top and sinkDetails
remove old cabinets in 1 kichen and install new ones with 2 new circuits for outlets and new circuit for dishwasher and garbage disposal to meet code. also install six 26 watt florescent ceiling lights to meet code. also install new granite top and sink | $9,100 |