Back to bathroom remodel contractors
Nicholas Renovations Inc
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2017 to Oct 2020
- Last 24 months
- 0 permits filed
5 permits since 2000: 5 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 0 days from filing to permit and 351 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2018 | Completed final sign-off Mar 2019 | 115 Stillings Av | new exterior windows tile work, new vanity, toliet, exhaust fan, lighting in bathroom in kind, paint, main non-habitable repair basement, led cans, sheet rock window counter tops tile floor repair sheet rock. street facing windows to be wood alum clad. u-factor 0.32.Details
new exterior windows tile work, new vanity, toliet, exhaust fan, lighting in bathroom in kind, paint, main non-habitable repair basement, led cans, sheet rock window counter tops tile floor repair sheet rock. street facing windows to be wood alum clad. u-factor 0.32. | $21,000 |
| Oct 12, 2017 | Completed final sign-off May 2019 | 289 Cayuga Av | tile floors, floor refinishing, painting interior exterior, vent holes, new garage door. new counter tops, new cabinets, door-kitchen, lighting fixtures ceilings, under cabinet leds's, replace existing laudnry tub, replace existing gas dryer, new baths kitchen faucets, dishwasher, disposal, fridgeDetails
tile floors, floor refinishing, painting interior exterior, vent holes, new garage door. new counter tops, new cabinets, door-kitchen, lighting fixtures ceilings, under cabinet leds's, replace existing laudnry tub, replace existing gas dryer, new baths kitchen faucets, dishwasher, disposal, fridge | $56,000 |