Nicholas Burnham Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2012 to Apr 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 18, 2019 | Completed final sign-off Jul 2020 | 18 Romain St | interior renovation at 1st story of (e) single family residence. reconfigure exiting storage space to contain 1 (n) bathroom, 1 (n) media room and 1 (n) office.Details
interior renovation at 1st story of (e) single family residence. reconfigure exiting storage space to contain 1 (n) bathroom, 1 (n) media room and 1 (n) office. | $30,000 |
| Sep 17, 2018 | Completed final sign-off Mar 2019 | 5517 Diamond Heights Bl | kitchen and bathroom remodel. 25' x 15' sqft. replace tile, flooring, and countertops. install cabinets, repair dryrot. update electrical as needed. install new fixtures. like for like. new vanity.Details
kitchen and bathroom remodel. 25' x 15' sqft. replace tile, flooring, and countertops. install cabinets, repair dryrot. update electrical as needed. install new fixtures. like for like. new vanity. | $30,000 |
| Sep 5, 2018 | Completed final sign-off Nov 2018 | 822 Duncan St | bathroom: fixture and tile replacement, bring to code as needed/repair as need.Details
bathroom: fixture and tile replacement, bring to code as needed/repair as need. | $10,000 |
| May 4, 2018 | Completed final sign-off Oct 2018 | 2214 47th Av | replace (kitchen) cabinets like for like, remove acoustic tile with drywall, refinishfloor, replace (bath) tile/remove, replace vanity like for like, update electrical/plumb to code as required (no change of (e) floor plan)Details
replace (kitchen) cabinets like for like, remove acoustic tile with drywall, refinishfloor, replace (bath) tile/remove, replace vanity like for like, update electrical/plumb to code as required (no change of (e) floor plan) | $35,000 |