Nibbi Bros Assoc Inc.
- Based in
- San Francisco
- On San Francisco permits
- Oct 2007 to Sep 2026
- Last 24 months
- 40 permits filed
495 permits since 2000: 353 completed, 32 in progress, 88 never finaled, 22 expired or cancelled.
Of the 88 never-finaled permits, 6 are 3 to 5 years old, 33 are 5 to 10 years old, 49 are over 10 years old. 2 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
50 kitchen remodel permits: 32 completed, 11 never finaled, 7 expired or cancelled. Typically 224 days from filing to permit and 643 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2021 | Completed final sign-off Nov 2021 | 1340 04th St | first time t.i to one vacant 'e' retail space on level 1 cold shell in a recently completed podium. project area is approx. 1057 sq.ft including a storage closet and kitchenette to serve as a mission bay community food hub in partnership with sf marin food bank.Details
first time t.i to one vacant 'e' retail space on level 1 cold shell in a recently completed podium. project area is approx. 1057 sq.ft including a storage closet and kitchenette to serve as a mission bay community food hub in partnership with sf marin food bank. | $95,130 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Linden St | bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 3. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,473,000 |
| Dec 27, 2019 | Never finaled issued Jan 2021, no final | 645 Linden St | bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a.Details
bldg 5. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements.maher n/a. | $2,130,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 500 Webster St | bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 7. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 751 Hayes St | bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 1. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $4,260,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 650 Fell St | bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 6. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $3,408,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 695 Buchanan St | bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 2. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Dec 27, 2019 | Expired or cancelled expired Jun 2026 | 550 Webster St | bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a.Details
bldg 4. 100% affordable housing w/ deferred payment, new kitchen, bath cabinets, counter top, flooring, fixtures, appliances, mep upgrades, ext doors, stucco repair, court yard landscape, flatwork & accessibility improvements. maher n/a. | $1,278,000 |
| Aug 14, 2019 | Never finaled issued Jul 2020, no final | 409 Page St | bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements.Details
bldg 8. rad rehab work includes: (n) kitchens, bath cabinets, countertops, flooring, fixtures, appliances & mep upgrades throughout. exterior work includes: roofing, flashing, gutters, windows, ext doors, garage doors, stucco repair, courtyard, landscaping, flatwork & accessibility improvements. | $4,330,000 |
| Jun 15, 2018 | Completed final sign-off Oct 2019 | 2700 Arelious Walker Dr | priority plan review. revisions to pa # 201401166475. mod field review comments regarding acces compliance to residential units: 230, 229, 228 & 227. work includes walkway in unit entry doors, modifications to kitchen & bathrooms. maher n/aDetails
priority plan review. revisions to pa # 201401166475. mod field review comments regarding acces compliance to residential units: 230, 229, 228 & 227. work includes walkway in unit entry doors, modifications to kitchen & bathrooms. maher n/a | |
| Jun 14, 2018 | Completed final sign-off Oct 2019 | 2600 Arelious Walker Dr | priority plan review. revision to pa # 201401166470. addressing m.o.d field review comments regarding access compliance to residential units: 202, 203, 204 and 205. includes exterior walkways, unit entry door, modifications to kitchens & bathrooms. maher n/aDetails
priority plan review. revision to pa # 201401166470. addressing m.o.d field review comments regarding access compliance to residential units: 202, 203, 204 and 205. includes exterior walkways, unit entry door, modifications to kitchens & bathrooms. maher n/a | |
| May 21, 2018 | Completed final sign-off Aug 2019 | 2500 Arelious Walker Dr | revision required to address mod field review. units 201, 202, 204 & 205. revision includes unit entry door from exterior walkway, modification to kitchen & bathrooms. revision to 2015-0123-6565-s1/r1.Details
revision required to address mod field review. units 201, 202, 204 & 205. revision includes unit entry door from exterior walkway, modification to kitchen & bathrooms. revision to 2015-0123-6565-s1/r1. | $3,000 |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1817 Eddy St | bld 15 - rad program submittal revision to 201504305056: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 15 - rad program submittal revision to 201504305056: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1841 Eddy St | bld 14 - rad program submittal revision to 201504305046: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 14 - rad program submittal revision to 201504305046: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1746 Turk St | bld 20 - rad program submittal revision to 201504305058: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 20 - rad program submittal revision to 201504305058: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1151 Scott St | bld 17 - rad program submittal revision to 201504305037: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 17 - rad program submittal revision to 201504305037: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1111 Scott St | bld 18 - rad program submittal revision to 201504305057: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 18 - rad program submittal revision to 201504305057: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1770 Turk St | bldg 21 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bldg 21 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1865 Eddy St | bldg. 13 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bldg. 13 - rad program submittal revision to 201504305039: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1157 Scott St | bld 16 - rad program submittal revision to 201504305036: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 16 - rad program submittal revision to 201504305036: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Sep 9, 2016 | Never finaled issued Oct 2016, no final | 1722 Turk St | bld 19 - rad program submittal revision to 201504305038: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher naDetails
bld 19 - rad program submittal revision to 201504305038: modification of kitchens & bathrooms, flooring & finishes, ext lighting to be replaced sprinklers under sep permit. to clarify scope of accessibility improvements reqd by mod - 2010 ada standards maher na | |
| Apr 30, 2015 | Completed final sign-off Nov 2016 | 1668 Turk St | bldg 8. rad program submit.modernization units to incl kitchens,bathrms, lighting & finishes.reconf 2 units for accessibility.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1668,1670,1672,1674,1676,1678,1680,1682,1684,1686,1688,1690 turk st.Details
bldg 8. rad program submit.modernization units to incl kitchens,bathrms, lighting & finishes.reconf 2 units for accessibility.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1668,1670,1672,1674,1676,1678,1680,1682,1684,1686,1688,1690 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1151 Scott St | bldg 17. rad program submittal.moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1151, 1153, 1155 scott st.Details
bldg 17. rad program submittal.moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1151, 1153, 1155 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1157 Scott St | bldg 16.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit.1157,1159,1161,1163,1165,1167,1169,1171,1173,1175,1177,1179 scott st.Details
bldg 16.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit.1157,1159,1161,1163,1165,1167,1169,1171,1173,1175,1177,1179 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Nov 2017 | 1746 Turk St | bldg 20.rad prog submit.modernization units to incl kitchens,bathrms, lighting&finishes.reconf 1 unit for accessibility.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit.1746,1748,1750,1752,1754,1756,1758,1760,1762,1764,1766,1768 turk st.Details
bldg 20.rad prog submit.modernization units to incl kitchens,bathrms, lighting&finishes.reconf 1 unit for accessibility.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit.1746,1748,1750,1752,1754,1756,1758,1760,1762,1764,1766,1768 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Jun 2018 | 1751 Eddy St | bldg 3.rad progm submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1751,1753,1755,1757,1759,1761,1763,1765,1767,1769,1771,1773 eddy st.Details
bldg 3.rad progm submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1751,1753,1755,1757,1759,1761,1763,1765,1767,1769,1771,1773 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1111 Scott St | bldg 18. rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1111,1113,1115,1117,1119,1121,1123,1125,1127,1129,1131,1133 scott st.Details
bldg 18. rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1111,1113,1115,1117,1119,1121,1123,1125,1127,1129,1131,1133 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2017 | 1160 Scott St | bldg 11.rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1160,1162,1164,1166 scott st.Details
bldg 11.rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1160,1162,1164,1166 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1140 Scott St | bldg 10. rad program submittal. modernization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replace.fire sprinkler under separate permit. 1140, 1142 1144 1146 scott st.Details
bldg 10. rad program submittal. modernization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replace.fire sprinkler under separate permit. 1140, 1142 1144 1146 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2017 | 1867 Eddy St | bldg 13. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1867, 1871, 1873, 1875, 1865, 1869 eddy st.Details
bldg 13. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1867, 1871, 1873, 1875, 1865, 1869 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2016 | 1644 Turk St | bldg 7. rad prog submittal.modernize units inclu kitchens, bathrooms, lighting&finishes. reconfigure 1 unit for accessibility.fire sprinkler under sep permit. 1644,1646,1648,1650,1652,1654,1656,1658,1660,1662,1664,1666 turk st.Details
bldg 7. rad prog submittal.modernize units inclu kitchens, bathrooms, lighting&finishes. reconfigure 1 unit for accessibility.fire sprinkler under sep permit. 1644,1646,1648,1650,1652,1654,1656,1658,1660,1662,1664,1666 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1151 Pierce St | bldg 5.rad progm submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1151,1153,1155,1157,1159,1161,1163,1165,1167,1169,1171,1173 pierce st.Details
bldg 5.rad progm submit.modernization units to incl kitchens,bathrms, flring&finishes.replc exterior lighting.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1151,1153,1155,1157,1159,1161,1163,1165,1167,1169,1171,1173 pierce st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Oct 2017 | 1841 Eddy St | bldg 14. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring two units for accessibility. fire sprinkler under separate permit. 1841,1843,1845,1847,1849,1851,1853,1855,1857,1859,1861,1863 eddy st.Details
bldg 14. rad program submittal. modernization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring two units for accessibility. fire sprinkler under separate permit. 1841,1843,1845,1847,1849,1851,1853,1855,1857,1859,1861,1863 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Jun 2018 | 1111 Pierce St | bldg 6.rad prog submittal.modernize units to incl kitchens, bathrms,lighting&finishes.reconfigure 1 unit for accessibility.fire sprinkler under separate permit.1111,1113,1115,1117,1119,1121 pierce st,1620,1622,1624,1626,1638,1630,1632,1634,1636,1638,1640,1642 turk st.Details
bldg 6.rad prog submittal.modernize units to incl kitchens, bathrms,lighting&finishes.reconfigure 1 unit for accessibility.fire sprinkler under separate permit.1111,1113,1115,1117,1119,1121 pierce st,1620,1622,1624,1626,1638,1630,1632,1634,1636,1638,1640,1642 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Jul 2017 | 1770 Turk St | bldg 21.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1770, 1772, 1774, 1776, 1778, 1780 turk st.Details
bldg 21.rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1770, 1772, 1774, 1776, 1778, 1780 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1817 Eddy St | bldg 15. rad prog submit.modernization units to incl kitchens,bathrms, lighting&finishes.reconf 1 unit for accessibility.1 unit modified for notication accessibility(hearing/visual disability). sprinkler under seperate permit.1817,1819,1821,1823,1825,1827,1829,1831,1833,1835,1837,1839 eddy st.Details
bldg 15. rad prog submit.modernization units to incl kitchens,bathrms, lighting&finishes.reconf 1 unit for accessibility.1 unit modified for notication accessibility(hearing/visual disability). sprinkler under seperate permit.1817,1819,1821,1823,1825,1827,1829,1831,1833,1835,1837,1839 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Nov 2017 | 1100 Scott St | bldg 9. rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1100,1102,1104,1106,1108,1110 scott st.Details
bldg 9. rad prog submit.modernization units to incl kitchens,bathrms, flring&finishes.1 unit modified for notication accessibility(hearing/visual disability).sprinkler under seperate permit. 1100,1102,1104,1106,1108,1110 scott st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Dec 2017 | 1777 Eddy St | bldg 2. rad program submittal. moderization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1777, 1779, 1781, 1783, 1785, 1787, 1789, 1791, 1793, 1795, 1797, 1799 eddy st.Details
bldg 2. rad program submittal. moderization of units to include kitchens, bathrooms, lighting and finishes. reconfiguring one unit for accessibility. fire sprinkler under separate permit. 1777, 1779, 1781, 1783, 1785, 1787, 1789, 1791, 1793, 1795, 1797, 1799 eddy st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Nov 2017 | 1717 Eddy St | bldg 4.rad prog submit.modern units incl kitchens,bathrms, flring&finishes.replc exter liting.1 unit modified for notificatn accessty(hearing/visual disability).1717,1719,1721,1723,1725,1727,1729,1731,1733,1735,1737,1739 eddy st.1175,1177,1179,1181,1183,1185 pierce st.Details
bldg 4.rad prog submit.modern units incl kitchens,bathrms, flring&finishes.replc exter liting.1 unit modified for notificatn accessty(hearing/visual disability).1717,1719,1721,1723,1725,1727,1729,1731,1733,1735,1737,1739 eddy st.1175,1177,1179,1181,1183,1185 pierce st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Sep 2017 | 1722 Turk St | bldg 19. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1722, 1724, 1726, 1728, 1730, 1732, 1734, 1736, 1738, 1740, 1742, 1744 turk st.Details
bldg 19. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1722, 1724, 1726, 1728, 1730, 1732, 1734, 1736, 1738, 1740, 1742, 1744 turk st. | $1,087,090 |
| Apr 30, 2015 | Completed final sign-off Dec 2017 | 1190 Scott St | bldg 1. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1190, 1194, 1198, 1196, 1188 scott st.Details
bldg 1. rad program submittal. moderization of units to include kitchens, bathrooms, flooring and finishes. exterior lighting to be replaced. sprinklers under separate permit. 1190, 1194, 1198, 1196, 1188 scott st. | $1,087,090 |
| Nov 7, 2014 | Completed final sign-off Aug 2015 | 3590 19th St | revision to 201405196095. minor revision to community kitchen. addition of sink at laundry room. dlete siding replacement. replace existing tubs with whower pans. add air conditioning to elev. mech room. replace lights/outlets at elev mech room and elev hoistway. add ceiling light fixture to unitDetails
revision to 201405196095. minor revision to community kitchen. addition of sink at laundry room. dlete siding replacement. replace existing tubs with whower pans. add air conditioning to elev. mech room. replace lights/outlets at elev mech room and elev hoistway. add ceiling light fixture to unit | |
| Aug 7, 2014 | Completed final sign-off Mar 2015 | 150 Golden Gate Av | basement only. demo of existing walls and doors. construction of new walls and doors, relocate kitchenette. mech, fire suppression and fire alarm design build sep permit. n/a for maherDetails
basement only. demo of existing walls and doors. construction of new walls and doors, relocate kitchenette. mech, fire suppression and fire alarm design build sep permit. n/a for maher | $200,000 |
| Jun 26, 2014 | Completed final sign-off Mar 2015 | 150 Golden Gate Av | 1st floor:demolition of existing partition walls/doors. remove existing kitchen equipment. new partition walls, doors, reception desk. n/a for maher ordinance. mep/sprinklers separate permits.Details
1st floor:demolition of existing partition walls/doors. remove existing kitchen equipment. new partition walls, doors, reception desk. n/a for maher ordinance. mep/sprinklers separate permits. | $250,000 |
| May 19, 2014 | Completed final sign-off Aug 2015 | 3590 19th St | window replacement, shingle siding replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, replace existing boilers and plumbing fixtures.Details
window replacement, shingle siding replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, replace existing boilers and plumbing fixtures. | $3,418,000 |
| May 19, 2014 | Completed final sign-off Jul 2015 | 3298 25th St | window replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, water heater and furnace replacement, replace existing plumbing fixtures.Details
window replacement, renovation of existing residential unit kitchens, bathrooms and finishes, existing light fixture replacement and new gfi outlets at kitchen/bathrooms, water heater and furnace replacement, replace existing plumbing fixtures. | $1,241,000 |
| Feb 22, 2012 | Completed final sign-off Apr 2013 | 2235 03rd St | interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309.Details
interior build out of childcare space including classrooms, restrms, kitchen, office, conference rm and break rm spaces. this also includ construtn of exterior space for a paved exit path grassed area. ref. to approved #200907092309. | |
| Dec 20, 2010 | Completed final sign-off Nov 2014 | 121 Golden Gate Av | t.i to shell building t0 be contructed at 121 golden gate av. work including new partitions, kitchen equipment, iinterior improvements & mep. ref pa# 2010/12/15/6753-s. 1st time tenant improvement.Details
t.i to shell building t0 be contructed at 121 golden gate av. work including new partitions, kitchen equipment, iinterior improvements & mep. ref pa# 2010/12/15/6753-s. 1st time tenant improvement. | $2,000,000 |
| Nov 1, 2010 | Completed final sign-off Nov 2012 | 350 Golden Gate Av | increase unit count fr 51 to 70, 19 additional units. 2 new laundry rms on 3rd,4th fl. reconfigure ground floor into new entry & property mgmt offices, install new closets in existing 51 units. new stores to add to existing kitchenette.Details
increase unit count fr 51 to 70, 19 additional units. 2 new laundry rms on 3rd,4th fl. reconfigure ground floor into new entry & property mgmt offices, install new closets in existing 51 units. new stores to add to existing kitchenette. | $2,000,000 |
| Jul 1, 2010 | Expired or cancelled cancelled Jan 2026 | 5600 03rd St | first t.i. get fresh juice bar - 1st fl.partitions, dropped ceilings, electrical, plumbing, hvac distribution, kitchen equipment, flooring. new construction permit under pa# 2007.03.13.6088Details
first t.i. get fresh juice bar - 1st fl.partitions, dropped ceilings, electrical, plumbing, hvac distribution, kitchen equipment, flooring. new construction permit under pa# 2007.03.13.6088 | $100,000 |