Nguyen Construction Co.
- Based in
- Hayward
- On San Francisco permits
- Dec 2016 to Sep 2026
- Last 24 months
- 3 permits filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 8 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 31, 2026 | In progress issued Aug 2026 | 326 Santa Ana Av | revision previously approved buidling permit 202406043630 for bathroom layout and structrual updates.Details
revision previously approved buidling permit 202406043630 for bathroom layout and structrual updates. | |
| Mar 2, 2026 | Completed final sign-off Sep 2026 | 1830 Green St | replace in-kind/ same size bath tub, toilet, sinks. adding kitchen counter top 6'. no new wall, no wall demoDetails
replace in-kind/ same size bath tub, toilet, sinks. adding kitchen counter top 6'. no new wall, no wall demo | $5,000 |
| Jun 27, 2024 | In progress issued Feb 2025 | 326 Santa Ana Av | remodel existing single family dwelling; 1st flr- add bathroom & replace kitchen fixtures; basement- fill-in below rear overhang & excavate front window well for new bedroom & office.Details
remodel existing single family dwelling; 1st flr- add bathroom & replace kitchen fixtures; basement- fill-in below rear overhang & excavate front window well for new bedroom & office. | $575,000 |
| Dec 19, 2016 | Completed final sign-off Jul 2017 | 655 Congo St | 1)convert extg storage & utility room on 1st floor to 2 bedrooms and one bath. conversion 622 sq ft. 2)volutary seismic retrofit for whole bldg to resist 30% more of seismic lateral force. 3)bring electric to code rewiring all house and replace all electrical fixtures. 4)replace all windows,Details
1)convert extg storage & utility room on 1st floor to 2 bedrooms and one bath. conversion 622 sq ft. 2)volutary seismic retrofit for whole bldg to resist 30% more of seismic lateral force. 3)bring electric to code rewiring all house and replace all electrical fixtures. 4)replace all windows, | $30,000 |