Ng Tony Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Nov 2007
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2007 | Completed final sign-off Nov 2007 | 62 Castenada Av | replace 2 rear yard windows (wood) 3'-6" x 5'-0" & 4'-0" x 5'-0" with 2 wood windows in kind. repair 2 panel of front wood window 2'-0" x 5'-0". glazing only. 0.67 u factor max.Details
replace 2 rear yard windows (wood) 3'-6" x 5'-0" & 4'-0" x 5'-0" with 2 wood windows in kind. repair 2 panel of front wood window 2'-0" x 5'-0". glazing only. 0.67 u factor max. | $4,000 |
| Apr 27, 2007 | Completed final sign-off Oct 2007 | 1359 21st Av | revisions to appln no.2006/12/22/0418 convert two storage to one play & 1 bedrm & legalize existing full bathrm on (e) g/f per plansDetails
revisions to appln no.2006/12/22/0418 convert two storage to one play & 1 bedrm & legalize existing full bathrm on (e) g/f per plans | $10,000 |
| Jan 10, 2006 | Completed final sign-off Nov 2006 | 1 Manzanita Av | kitchen & bath remodel-both units. remove some (e) non bearing walls & configure room layout,change all windows in kind except raise sill of 2 windows in kitchen at 2/f. .67 u factor min.Details
kitchen & bath remodel-both units. remove some (e) non bearing walls & configure room layout,change all windows in kind except raise sill of 2 windows in kitchen at 2/f. .67 u factor min. | $65,000 |
| Aug 15, 2005 | Completed final sign-off Sep 2005 | 202 Kirkham St | repair the rear exterior stairs about 25 percent dry rot & path the holes in the ground flr ceilingDetails
repair the rear exterior stairs about 25 percent dry rot & path the holes in the ground flr ceiling | $1,800 |
| Jul 22, 2005 | Completed final sign-off Aug 2005 | 1331 26th Av | repair stairs in lightwell,dryrot. less than 50%Details
repair stairs in lightwell,dryrot. less than 50% | $1,500 |
| May 5, 2005 | Completed final sign-off Aug 2005 | 1270 28th Av | replace 7 of 18 front steps ( existing)and minor repair of stucco under landing and stepsDetails
replace 7 of 18 front steps ( existing)and minor repair of stucco under landing and steps | $2,400 |
| Oct 3, 2002 | Completed final sign-off Jan 2003 | 828 Quintara St | changes 2 bathroom tub fixture & tile.Details
changes 2 bathroom tub fixture & tile. | $5,500 |
| Jan 16, 2001 | Completed final sign-off Feb 2001 | 21 Cameo Wy | replace few dryrot deck board at existing deck.Details
replace few dryrot deck board at existing deck. | $1,000 |
| Aug 17, 2000 | Completed final sign-off Dec 2000 | 828 Quintara St | change kitchen cabinet & countertop, change wood windo w/wood windowDetails
change kitchen cabinet & countertop, change wood windo w/wood window | $7,400 |
| May 3, 2000 | Completed final sign-off Jun 2000 | 380 San Leandro Wy | remodel bathroom, change plumbing fixturesDetails
remodel bathroom, change plumbing fixtures | $6,000 |
| Mar 22, 2000 | Expired or cancelled expired Sep 2000 | 1861 37th Av | kitchen remodelingDetails
kitchen remodeling |