Back to bathroom remodel contractors
Ng's Landmark Bldg & Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Dec 2022
- Last 24 months
- 0 permits filed
92 permits since 2000: 76 completed, 6 never finaled, 10 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 19 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 1724 Judah St | install bathroom fan for both units. total 2 bathroom fans. rigid dust work required. maintain unit separationDetails
install bathroom fan for both units. total 2 bathroom fans. rigid dust work required. maintain unit separation | $4,000 |
| Oct 31, 2017 | Completed final sign-off Feb 2019 | 1462 Newcomb Av | remodel kitchen & dining & upper bathroom. addition of new powder room and new deck at main level of living & new laundry closet. removal of existing bathroom at rear of property.Details
remodel kitchen & dining & upper bathroom. addition of new powder room and new deck at main level of living & new laundry closet. removal of existing bathroom at rear of property. | $200,000 |
| Feb 1, 2017 | Completed final sign-off Apr 2017 | 148 Robinhood Dr | remodel 2nd floor hallway bathroom.Details
remodel 2nd floor hallway bathroom. | $20,000 |
| Jan 30, 2015 | Completed final sign-off Mar 2015 | 414 Duncan St | partial compliance with his nov 201517921 dated 1/16/2015; replace tub & faucet, tub surround, tub enclosure & painting of bathroom.Details
partial compliance with his nov 201517921 dated 1/16/2015; replace tub & faucet, tub surround, tub enclosure & painting of bathroom. | $5,000 |
| Jan 29, 2015 | Completed final sign-off Aug 2015 | 2748 Steiner St | remodel bathroom within the space of the extg bathroom, remove non-structural wall between toilet compartment and shower area.Details
remodel bathroom within the space of the extg bathroom, remove non-structural wall between toilet compartment and shower area. | $16,500 |
| Aug 19, 2014 | Completed final sign-off Jan 2015 | 1715 Anza St | remodel kitchen and bathDetails
remodel kitchen and bath | $40,000 |
| Dec 9, 2013 | Completed final sign-off Apr 2014 | 135 Robinhood Dr | new bathroom in existing garageDetails
new bathroom in existing garage | $11,329 |
| Jul 16, 2013 | Completed final sign-off Nov 2013 | 1430 33rd Av | replace kitchen cabinets, countertop, replace upstairs bathroom tile, tub, faucet, shower faucet, replace in kind.Details
replace kitchen cabinets, countertop, replace upstairs bathroom tile, tub, faucet, shower faucet, replace in kind. | $15,000 |
| Sep 28, 2012 | Completed final sign-off Nov 2012 | 1 Lomita Av | add electrical sub-panek in garage. remodel guest bath bathroom in kind, same location. comply cec 150(k)10Details
add electrical sub-panek in garage. remodel guest bath bathroom in kind, same location. comply cec 150(k)10 | $8,000 |
| Apr 26, 2012 | Completed final sign-off May 2012 | 1553 Kirkwood Av | revision to pa# 200804018518s. scope of alteration areas adjust interior stair location. ground floor: relocation of laundry under stair, add cabinets in hall&re-arrange bath. second floor: re-arrange bathroom & kitchen. third floor: add one bath & one bedroom&re-arrange one bathroom.add 1 skylighDetails
revision to pa# 200804018518s. scope of alteration areas adjust interior stair location. ground floor: relocation of laundry under stair, add cabinets in hall&re-arrange bath. second floor: re-arrange bathroom & kitchen. third floor: add one bath & one bedroom&re-arrange one bathroom.add 1 skyligh | $15,000 |
| Jul 14, 2011 | Completed final sign-off Apr 2012 | 148 Robinhood Dr | kitchen renovation and new bath on 1st floor. replace some windows in rear and side of bldg.Details
kitchen renovation and new bath on 1st floor. replace some windows in rear and side of bldg. | $50,000 |
| Jul 29, 2010 | Expired or cancelled cancelled Jan 2026 | 650 02nd St | build a raised platform, new closet area, remodel kitchen, add 2 doors to (e) bathroom, replace bathroom faucet & sink, new book shelvesDetails
build a raised platform, new closet area, remodel kitchen, add 2 doors to (e) bathroom, replace bathroom faucet & sink, new book shelves | $60,000 |
| Aug 7, 2008 | Completed final sign-off Dec 2009 | 145 Commonwealth Av | remodel existing bathroom and furnace room.Details
remodel existing bathroom and furnace room. | $35,000 |
| Apr 1, 2008 | Completed final sign-off May 2012 | 1553 Kirkwood Av | horizontal and vertical addition.g/f: horizontal addition & add habitable space., 2/f: horizontal addition & remodel of (e), 3/f: add bath to (e) attic, add (n) 3rd story @ (e) & (n) front of (e) bldg. is remaining architecturaly unchanged.Details
horizontal and vertical addition.g/f: horizontal addition & add habitable space., 2/f: horizontal addition & remodel of (e), 3/f: add bath to (e) attic, add (n) 3rd story @ (e) & (n) front of (e) bldg. is remaining architecturaly unchanged. | $200,000 |
| Nov 28, 2007 | Expired or cancelled expired Mar 2010 | 1553 Kirkwood Av | alteration of existing kitchen and bathroom on the second floor.new drywall,finishes , fixtures and lightingDetails
alteration of existing kitchen and bathroom on the second floor.new drywall,finishes , fixtures and lighting | $40,000 |
| Oct 5, 2007 | Completed final sign-off Jan 2008 | 68 07th Av | remodel existing bathroom . no lighting change.Details
remodel existing bathroom . no lighting change. | $15,000 |
| Sep 6, 2007 | Completed final sign-off Jun 2008 | 1536 Newcomb Av | construct two bedrooms, bathroom and laundry areas at ground floor.Details
construct two bedrooms, bathroom and laundry areas at ground floor. | $26,000 |
| Jul 17, 2007 | Completed final sign-off Oct 2015 | 46 Presidio Av | remodel 2 existing bathrooms on top floor any change of lights will comply with title 24 (50% of fluorescent lights).Details
remodel 2 existing bathrooms on top floor any change of lights will comply with title 24 (50% of fluorescent lights). | $20,000 |
| May 12, 2005 | Completed final sign-off Sep 2005 | 517 Belvedere St | remodel existing bathroom. no structural work. provide flourescent light fixtureDetails
remodel existing bathroom. no structural work. provide flourescent light fixture | $8,000 |
| Sep 11, 2003 | Completed final sign-off Feb 2004 | 202 Roosevelt Wy | replace existing bath tub w/ jacuzzi to new steam walk-in shower @ lower unit master bath.Details
replace existing bath tub w/ jacuzzi to new steam walk-in shower @ lower unit master bath. | $10,000 |
| Jun 9, 2003 | Completed final sign-off Oct 2003 | 3777 22nd St | replace (e) bathroom w/new tile, plumb fix., smooth (e) sheet rock in dining room. add outlets/switcDetails
replace (e) bathroom w/new tile, plumb fix., smooth (e) sheet rock in dining room. add outlets/switc | $12,000 |
| Aug 9, 2000 | Completed final sign-off Mar 2001 | 278 Country Club Dr | replace kitchen cabinets, flooring, appliances, plmbg fixtures, replace bathroom plumbing fixturesDetails
replace kitchen cabinets, flooring, appliances, plmbg fixtures, replace bathroom plumbing fixtures | $40,000 |