Back to bathroom remodel contractors
Newsontec General
- Based in
- Daly City
- On San Francisco permits
- Dec 2010 to Sep 2026
- Last 24 months
- 21 permits filed
31 permits since 2000: 14 completed, 14 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 6 completed, 4 in progress, 1 expired or cancelled. Typically 6 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 245 Silver Av | fix and repair the damage sheetrock at bathrooms, bedrooms and living room.Details
fix and repair the damage sheetrock at bathrooms, bedrooms and living room. | $6,000 |
| May 5, 2026 | Completed final sign-off Jun 2026 | 240 27th Av | comply with nov# 202651247: repair water damage/moldy sheetrock, replace bath fans, and paint at bathroom. fix and repair the dishwasher. skylight reapir at bath. all work in kind.Details
comply with nov# 202651247: repair water damage/moldy sheetrock, replace bath fans, and paint at bathroom. fix and repair the dishwasher. skylight reapir at bath. all work in kind. | $5,200 |
| Dec 17, 2025 | In progress issued Jan 2026 | 2067 Quesada Av | revision 201505196632-s1- add (n) walk in and full bathroom at media room, relocate laundry to garageDetails
revision 201505196632-s1- add (n) walk in and full bathroom at media room, relocate laundry to garage | $20,000 |
| Oct 27, 2025 | Completed final sign-off Jun 2026 | 2984 20th Av | 1st fl: remodel (e) bedroom and bathroom. add wet bar, replace window at rear.Details
1st fl: remodel (e) bedroom and bathroom. add wet bar, replace window at rear. | $50,000 |
| Sep 26, 2025 | In progress issued Oct 2025 | 707 19th Av | remodel single family home. 1 new bath for bdrm on 2nd fl. remodel e bath, convert e kitchen to breakfast nook, convert e dining to kitchen on 2nd fl. remove e fireplace 2nd fl. replace e garage door with 8' wide by 7" height garage door.Details
remodel single family home. 1 new bath for bdrm on 2nd fl. remodel e bath, convert e kitchen to breakfast nook, convert e dining to kitchen on 2nd fl. remove e fireplace 2nd fl. replace e garage door with 8' wide by 7" height garage door. | $100,000 |
| Jul 15, 2025 | Completed final sign-off Apr 2026 | 44 Madrone Av | remodel 3rd floor bathroom. like for likeDetails
remodel 3rd floor bathroom. like for like | $20,000 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 95 Burlwood Dr | remodeling existing 2 baths and kitchen. like for like.Details
remodeling existing 2 baths and kitchen. like for like. | $45,000 |
| Nov 15, 2024 | In progress issued Nov 2024 | 381 Harkness Av | kitchen and bathroom remodel. remove and replace damage sheetrock at the house. run (n) electrical at the entire houseDetails
kitchen and bathroom remodel. remove and replace damage sheetrock at the house. run (n) electrical at the entire house | $60,000 |
| Aug 15, 2024 | Expired or cancelled expired Mar 2026 | 2176 16th Av | revision to permit 202406144502. 1/f: relocate concrete steps in rear yard. 2/f: remodel (e) kitchen. replace bathtub with shower in bathroom. replace front windows in-kind.Details
revision to permit 202406144502. 1/f: relocate concrete steps in rear yard. 2/f: remodel (e) kitchen. replace bathtub with shower in bathroom. replace front windows in-kind. | $50,000 |
| Jun 14, 2024 | Completed final sign-off Mar 2026 | 2176 16th Av | interior remodel: 1st floor to add 2 bedrooms, an exercise room, a bathroom. 2nd floor:remodel existing bedroom and bathroom.Details
interior remodel: 1st floor to add 2 bedrooms, an exercise room, a bathroom. 2nd floor:remodel existing bedroom and bathroom. | $90,000 |
| Apr 26, 2024 | Completed final sign-off Aug 2024 | 534 06th Av | remodel (e) bathroom and add (1) toilet.Details
remodel (e) bathroom and add (1) toilet. | $15,000 |