Back to bathroom remodel contractors
Newel&Co.Inc. Dba:Robertson- Jensen &Co.
- Based in
- Orinda
- On San Francisco permits
- Jun 2005 to Dec 2017
- Last 24 months
- 0 permits filed
27 permits since 2000: 9 completed, 8 never finaled, 10 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 234 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 27, 2017 | Never finaled issued Dec 2017, no final | 11 16th Av | replace insulation and drywall damage in downstairs and master baths. replace all finishes in basement bath down to studs. elec replace knob and tube wiring and existing main panel 14000. plumb rough valves for master showers and basementDetails
replace insulation and drywall damage in downstairs and master baths. replace all finishes in basement bath down to studs. elec replace knob and tube wiring and existing main panel 14000. plumb rough valves for master showers and basement | $37,000 |
| Aug 3, 2016 | Completed final sign-off Apr 2018 | 980 Baker St | unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit.Details
unit 2 - interior demo of (e) 2nd flr area for new stair opening. proposed stair to connect 1st & 2nd flrs. configuration of new wall at 1st - new bedroom/bath/closet/ new egress windows at rear. l/s, mep under separate permit. | $100,000 |
| Sep 16, 2014 | Expired or cancelled expired Aug 2018 | 2210 Broderick St | no change in layout at kitchen. kitchen minor remodel, (3) bathroom remodels: (1) at 1st fl, (1) at 2nd fl & (1) at 4th fl. replace roof (reroofing): remove existing asphalt shingle roof & install new in kind asphalt shingle roof system. remove existing tar & gravel roof system & install new siliconDetails
no change in layout at kitchen. kitchen minor remodel, (3) bathroom remodels: (1) at 1st fl, (1) at 2nd fl & (1) at 4th fl. replace roof (reroofing): remove existing asphalt shingle roof & install new in kind asphalt shingle roof system. remove existing tar & gravel roof system & install new silicon | $50,000 |
| May 29, 2014 | Never finaled issued Jun 2014, no final | 770 Guerrero St | interior alteration of door opening in family room, kitchen remodel, bathroom remodel, relocation of laundry, replace 4 windows not visible in street. all work in top floor unit only.Details
interior alteration of door opening in family room, kitchen remodel, bathroom remodel, relocation of laundry, replace 4 windows not visible in street. all work in top floor unit only. | $60,000 |
| Feb 11, 2011 | Completed final sign-off May 2011 | 3480 Clay St | interior remodel to existing residential apartment. no exterior work to be done. enlarge bedroom and master bath. all existing rooms to remain as existing use. add free standing shower in master bathDetails
interior remodel to existing residential apartment. no exterior work to be done. enlarge bedroom and master bath. all existing rooms to remain as existing use. add free standing shower in master bath | $60,000 |