New Improvement Construction
- Based in
- El Sobrante
- On San Francisco permits
- Nov 2005 to Jun 2022
- Last 24 months
- 0 permits filed
50 permits since 2000: 39 completed, 10 never finaled, 1 expired or cancelled.
Of the 10 never-finaled permits, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
26 bathroom remodel permits: 22 completed, 4 never finaled. Typically 0 days from filing to permit and 202 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2022 | Completed final sign-off Aug 2022 | 1594 29th Av | half bathroom remodel. replace floor tiles, cabinet, sink, toilet, and outlet.Details
half bathroom remodel. replace floor tiles, cabinet, sink, toilet, and outlet. | $3,000 |
| Nov 13, 2017 | Completed final sign-off Mar 2018 | 815 24th Av | add 1 bathroom, 1 bedroom, 1 laundry room on first floorDetails
add 1 bathroom, 1 bedroom, 1 laundry room on first floor | $30,000 |
| Apr 20, 2016 | Completed final sign-off Nov 2016 | 475 35th Av | 2nd flr, unit #1: convert (e) kitchen space to den, convert (e) dining room to kitchen/dining area, add a full bathroom, remodel (e) bathroom, upgrade (e) light fixturesDetails
2nd flr, unit #1: convert (e) kitchen space to den, convert (e) dining room to kitchen/dining area, add a full bathroom, remodel (e) bathroom, upgrade (e) light fixtures | $35,000 |
| Jun 19, 2015 | Completed final sign-off Apr 2016 | 475 35th Av | 1st floor: convert extg space to an exercise room, a guest room, a study, a full bathroom and laundry area. 3rd floor: add a study room, bathroom, remodel kitchen and extg bathroom.Details
1st floor: convert extg space to an exercise room, a guest room, a study, a full bathroom and laundry area. 3rd floor: add a study room, bathroom, remodel kitchen and extg bathroom. | $68,000 |
| Jun 18, 2015 | Completed final sign-off Nov 2016 | 1225 Athens St | legalize (e) unpermitted ground floor area to a new unit including 2 bedrooms, one full bath, one kitchen and living room.Details
legalize (e) unpermitted ground floor area to a new unit including 2 bedrooms, one full bath, one kitchen and living room. | $20,000 |
| Jun 9, 2015 | Completed final sign-off Dec 2016 | 2955 20th Av | legalize and renovate extg unit on ground floor including 4 bedrooms, 2 bath, family room and living room per ordinance 43-14Details
legalize and renovate extg unit on ground floor including 4 bedrooms, 2 bath, family room and living room per ordinance 43-14 | $60,000 |
| Jul 16, 2014 | Never finaled issued Jul 2014, no final | 306 24th Av | bathroom remodel (replace bath-tub, tiles, faucets and tiolet). no new wall and no existing wall relocation. provide minimum one layer of 5/8" type x gyp. board to match existing where (e)sheet rock will be replaced. lighting in bathroom remodel shall comply with cec150(k)10.Details
bathroom remodel (replace bath-tub, tiles, faucets and tiolet). no new wall and no existing wall relocation. provide minimum one layer of 5/8" type x gyp. board to match existing where (e)sheet rock will be replaced. lighting in bathroom remodel shall comply with cec150(k)10. | $7,000 |
| Jun 25, 2014 | Completed final sign-off Jun 2015 | 2624 15th Av | seismic upgrade, add family room, bathroom, wet bar at ground floor, remodel upper floor.Details
seismic upgrade, add family room, bathroom, wet bar at ground floor, remodel upper floor. | $30,000 |
| Nov 25, 2013 | Completed final sign-off Sep 2014 | 70 Terrace Dr | bathroom: replace bath tub, tiles & toilet. kitchen: replace cabinets & counter tops. no lighting changes.Details
bathroom: replace bath tub, tiles & toilet. kitchen: replace cabinets & counter tops. no lighting changes. | $6,000 |
| Aug 31, 2012 | Never finaled issued Sep 2012, no final | 339 20th Av | remodel (e) bathroom at 2nd. floor.Details
remodel (e) bathroom at 2nd. floor. | $5,000 |
| Nov 1, 2011 | Completed final sign-off Sep 2012 | 2350 22nd Av | remodel (e) kitchen, bathroom, change lighting, update electrical panel & outles, update tub & shower stall plumbing. no change on walls & openings.Details
remodel (e) kitchen, bathroom, change lighting, update electrical panel & outles, update tub & shower stall plumbing. no change on walls & openings. | $25,000 |
| Jul 11, 2011 | Completed final sign-off Oct 2011 | 1720 Alemany Bl | add one bedroom. legalize one existing bath and change existing utility room to new game room on proposed ground floor.Details
add one bedroom. legalize one existing bath and change existing utility room to new game room on proposed ground floor. | $25,000 |
| Oct 4, 2010 | Never finaled issued Apr 2014, no final | 225 San Benito Wy | new garage to be constructed & attached to the (e) building at street level per plan. change (e) garage to entertainment with half bath. in compliance of nov #201143129Details
new garage to be constructed & attached to the (e) building at street level per plan. change (e) garage to entertainment with half bath. in compliance of nov #201143129 | $65,000 |
| Aug 25, 2010 | Completed final sign-off Nov 2011 | 225 San Benito Wy | 1)remodel extg bath rooms, bed rooms at 1st floor and 2nd floor per plan. 2)change extg storage area to new office and storage room. add one 1/2 bath at basement level.Details
1)remodel extg bath rooms, bed rooms at 1st floor and 2nd floor per plan. 2)change extg storage area to new office and storage room. add one 1/2 bath at basement level. | $30,000 |
| Dec 10, 2009 | Completed final sign-off Aug 2010 | 10 Flood Av | replace kitchen cabinets in kind. retile-three bathrooms, new hardwood floors in upper level. repaint interior. all work on second floor. no electrical or plumbing work.Details
replace kitchen cabinets in kind. retile-three bathrooms, new hardwood floors in upper level. repaint interior. all work on second floor. no electrical or plumbing work. | $50,000 |
| Oct 1, 2009 | Completed final sign-off Mar 2010 | 830 24th Av | bathroom remodel & remove the (e) wall, relocate bathtub.Details
bathroom remodel & remove the (e) wall, relocate bathtub. | $7,000 |
| Jun 10, 2009 | Completed final sign-off Oct 2010 | 127 Milton St | remove and replace e brick foundation with new reincorded c oncrete foundation.remodel gr floor. add 2 bedrooms, 1 bath, 1 family room on 1st floor. proposed 1st fl living area 727 sf. replace and relocate water heater and furnace. add window at rear on 1st floorDetails
remove and replace e brick foundation with new reincorded c oncrete foundation.remodel gr floor. add 2 bedrooms, 1 bath, 1 family room on 1st floor. proposed 1st fl living area 727 sf. replace and relocate water heater and furnace. add window at rear on 1st floor | $40,000 |
| Apr 13, 2009 | Completed final sign-off Nov 2009 | 608 20th Av | remodel exisitng bathrooms & kitchen at 2nd & 3rd floor.Details
remodel exisitng bathrooms & kitchen at 2nd & 3rd floor. | $23,000 |
| Jan 12, 2009 | Completed final sign-off Apr 2009 | 3012 Baker St | remodel bathrooms & kitchens, add sink & toilet for both units, change cabinets, counters, lighting, replace wall and expand kitchen to nook area for both units.Details
remodel bathrooms & kitchens, add sink & toilet for both units, change cabinets, counters, lighting, replace wall and expand kitchen to nook area for both units. | $15,000 |
| Jul 3, 2008 | Completed final sign-off Sep 2008 | 509 Point Lobos Av | remodel ex. bedroom, relocate ex. full bath. and add new family room at groud floorDetails
remodel ex. bedroom, relocate ex. full bath. and add new family room at groud floor | $25,000 |
| Apr 4, 2008 | Completed final sign-off Jun 2009 | 562 San Jose Av | interior alteration - relocate kitchen from rear room to (e) dining room, change (e) kitchen to new bedroom & (e) living to bedroom, remodeling and add 1 full bathroom on 2nd & 3rd floor; install new laundry w/washer & dryer, add steel fram at 1st floor (e) garage.Details
interior alteration - relocate kitchen from rear room to (e) dining room, change (e) kitchen to new bedroom & (e) living to bedroom, remodeling and add 1 full bathroom on 2nd & 3rd floor; install new laundry w/washer & dryer, add steel fram at 1st floor (e) garage. | $50,000 |
| Nov 7, 2007 | Completed final sign-off Feb 2008 | 2559 42nd Av | remodel kitchen and bath room and add 1 new bathroom at first floor; add one bedroom, storage room, fam.room and one full bathroom at ground floor; construct a new deck at rear of building.Details
remodel kitchen and bath room and add 1 new bathroom at first floor; add one bedroom, storage room, fam.room and one full bathroom at ground floor; construct a new deck at rear of building. | $45,000 |
| Aug 17, 2007 | Completed final sign-off Dec 2007 | 1467 30th Av | add (n) family room, (n) excercise room, (n) play room and reconfigure (e) bathroom on ground floor.Details
add (n) family room, (n) excercise room, (n) play room and reconfigure (e) bathroom on ground floor. | $35,000 |
| May 21, 2007 | Completed final sign-off Sep 2007 | 906 Madrid St | to add 2 bedroom, one playroom/laundry room, 2 full bath room, one storage on extg ground floor. and also to add one new half bath room on extg 2nd floor per plan, and convert extg breakfast room to new bed room on 2nd floorDetails
to add 2 bedroom, one playroom/laundry room, 2 full bath room, one storage on extg ground floor. and also to add one new half bath room on extg 2nd floor per plan, and convert extg breakfast room to new bed room on 2nd floor | $26,000 |
| Mar 20, 2007 | Completed final sign-off Jun 2007 | 771 Clay St | add non-load bearing wall - all partition wall and new h.c. bathroomDetails
add non-load bearing wall - all partition wall and new h.c. bathroom | $30,000 |
| Oct 18, 2006 | Never finaled issued Oct 2006, no final | 221 03rd Av | revise approved pa#2006/07/28/7945-change two bedrooms. two bathrooms to one bedroom, one bath at groundfloorDetails
revise approved pa#2006/07/28/7945-change two bedrooms. two bathrooms to one bedroom, one bath at groundfloor |