Back to bathroom remodel contractors
New Horizon Contracting & Maintenance In
- Based in
- Concord
- On San Francisco permits
- Sep 2013 to Feb 2016
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 1, 2016 | Completed final sign-off Apr 2016 | 3334 Fillmore St | unit 105, remove existing kitchen cabinets and countertops. replace with new. demo all tile in bathroom & replace with new minor sheetrock repair & painting.Details
unit 105, remove existing kitchen cabinets and countertops. replace with new. demo all tile in bathroom & replace with new minor sheetrock repair & painting. | $15,000 |
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 3334 Fillmore St | #205 - remove existing cabinets & countertops in kitchen & replace with new. demo tile in bathroom & replace with new. minor sheetrock repair & painting.Details
#205 - remove existing cabinets & countertops in kitchen & replace with new. demo tile in bathroom & replace with new. minor sheetrock repair & painting. | $14,000 |
| Oct 21, 2013 | Completed final sign-off Dec 2013 | 1224 Hyde St | work in unit #6: remodel (e) kitchen and (e) bathroom, replace sheet rock at bedroom, main room, kitchen and bathroom with a total wall area of 800 sf. all new sheetrock shall be 5/8" type x gyp. board. lighting in kitchen and bathroom remodel shall comply with cec 150(k)8 & 150(k)10 resp.Details
work in unit #6: remodel (e) kitchen and (e) bathroom, replace sheet rock at bedroom, main room, kitchen and bathroom with a total wall area of 800 sf. all new sheetrock shall be 5/8" type x gyp. board. lighting in kitchen and bathroom remodel shall comply with cec 150(k)8 & 150(k)10 resp. | $15,500 |