New Home Construction Inc***See Notes***
- Based in
- San Rafael
- On San Francisco permits
- Jul 2007 to Feb 2008
- Last 24 months
- 0 permits filed
3 permits since 2000: 1 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2008 | Completed final sign-off Aug 2008 | 2021 10th Av | remodel of existing 2nd floor - move furnace 6' to rear of crawlspace, add 1/2 bath, add closet, replace windows in front, add recessed lights.Details
remodel of existing 2nd floor - move furnace 6' to rear of crawlspace, add 1/2 bath, add closet, replace windows in front, add recessed lights. | $55,000 |
| Jul 11, 2007 | Never finaled issued Jul 2007, no final | 1601 47th Av | repair dry rot, termite, decay, weathered damaged, sills, studs, joists, siding, decking, parapets, roof coatings as needed, new lighting.Details
repair dry rot, termite, decay, weathered damaged, sills, studs, joists, siding, decking, parapets, roof coatings as needed, new lighting. | $20,000 |
| Jul 6, 2007 | Never finaled issued Jul 2007, no final | 1601 47th Av | add bedroom and bathroom to downstairs, relocate furnace and water heater.Details
add bedroom and bathroom to downstairs, relocate furnace and water heater. | $20,000 |