Back to bathroom remodel contractors
New Dimension
- Based in
- Mill Valley
- On San Francisco permits
- Apr 2004 to Mar 2019
- Last 24 months
- 0 permits filed
18 permits since 2000: 17 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 8 completed. Typically 0 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2017 | Completed final sign-off Jun 2018 | 69 06th Av | interior remodel of one kitchen and two bathrooms on second floor. close existing openings in wall and add new openings as per plans.Details
interior remodel of one kitchen and two bathrooms on second floor. close existing openings in wall and add new openings as per plans. | $110,000 |
| Sep 11, 2014 | Completed final sign-off Mar 2015 | 579 24th Av | #2 - replace kitchen cabinets, bathroom fixtures and tiles and kitchen sink. replace lights, upgrade receptacles, move sub electrical panel to hallway.Details
#2 - replace kitchen cabinets, bathroom fixtures and tiles and kitchen sink. replace lights, upgrade receptacles, move sub electrical panel to hallway. | $28,000 |
| Oct 1, 2012 | Completed final sign-off May 2013 | 4255 24th St | bathroom remodel - change separate toilet room and seprate shower sink room to one bathroom. move washer dryter to other location. remodel existing laundry room to breakfast room.Details
bathroom remodel - change separate toilet room and seprate shower sink room to one bathroom. move washer dryter to other location. remodel existing laundry room to breakfast room. | $11,000 |
| Mar 8, 2012 | Completed final sign-off Mar 2013 | 441 Fulton St | kitchen and bathroom remodel. new fixtures, new cabinets, painting.Details
kitchen and bathroom remodel. new fixtures, new cabinets, painting. | $50,000 |
| Dec 19, 2011 | Completed final sign-off Jun 2012 | 579 24th Av | unit #3 kitchen & bath remodel: new sheetrock, cabinets, appliances, paint, new light fixtures @ kitchen. new fixtrues, new tiles, new light fixtures @ bath.Details
unit #3 kitchen & bath remodel: new sheetrock, cabinets, appliances, paint, new light fixtures @ kitchen. new fixtrues, new tiles, new light fixtures @ bath. | $28,000 |
| May 21, 2010 | Completed final sign-off Dec 2010 | 579 24th Av | apt #4 -remodeling of kitchen & bathroom, 2 fans, replace windows (17 ).Details
apt #4 -remodeling of kitchen & bathroom, 2 fans, replace windows (17 ). | $35,000 |
| Feb 7, 2007 | Completed final sign-off Jun 2007 | 1001 Pine St | 1 kitchen & 1 bath remodel. no change of location of appliance, new cabinets, flooring, new sink in kitchen. new flooring, new sink in bathroom. new light fixtures, more 50 % fluorcent light.Details
1 kitchen & 1 bath remodel. no change of location of appliance, new cabinets, flooring, new sink in kitchen. new flooring, new sink in bathroom. new light fixtures, more 50 % fluorcent light. | $15,000 |
| Apr 30, 2004 | Completed final sign-off Dec 2004 | 8 Edgehill Wy | remodel master bath,replace tile,lavatory,bath tub,(e) window (30"x36")Details
remodel master bath,replace tile,lavatory,bath tub,(e) window (30"x36") | $8,000 |