Back to bathroom remodel contractors
Neat Builders Inc
- Based in
- Hayward
- On San Francisco permits
- Dec 2019 to Jun 2022
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 4 days from filing to permit and 74 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2022 | Completed final sign-off Aug 2022 | 600 Alabama St | property was affected by water damage (2 bathrooms, kitchen and hallway). reinstall demolished tile, drywall repair (less than 50%), reinstall 2 toilets, reslap flooring, install vinyl floor that was damaged. kitchenette cabinets installation, sink installation, adding dedicated electrical line forDetails
property was affected by water damage (2 bathrooms, kitchen and hallway). reinstall demolished tile, drywall repair (less than 50%), reinstall 2 toilets, reslap flooring, install vinyl floor that was damaged. kitchenette cabinets installation, sink installation, adding dedicated electrical line for | $51,450 |
| Feb 10, 2022 | Completed final sign-off Apr 2022 | 90 Ord St | convert walk-in closet into laundry. convert part of bedroom into master bathroom. create opening for closet door in wall.Details
convert walk-in closet into laundry. convert part of bedroom into master bathroom. create opening for closet door in wall. | $63,000 |
| Dec 23, 2019 | Completed final sign-off Sep 2021 | 2619 Ortega St | increase headroom space at the ground level floor, electric panel upgrade. reslope and replace the main sewer line, replace foundation, layout changes. bathroom remodel at 2nd fl covent bath tub to shower.Details
increase headroom space at the ground level floor, electric panel upgrade. reslope and replace the main sewer line, replace foundation, layout changes. bathroom remodel at 2nd fl covent bath tub to shower. | $200,000 |