Back to bathroom remodel contractors
Nancy Built Llc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2020 to Jul 2026
- Last 24 months
- 16 permits filed
43 permits since 2000: 39 completed, 3 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 19 completed. Typically 0 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2026 | Completed final sign-off Jun 2026 | 2918 Baker St | replace finishes in kind for 1 bathroom including tub plus vanity, and replace tile floor only in powder room.Details
replace finishes in kind for 1 bathroom including tub plus vanity, and replace tile floor only in powder room. | $25,000 |
| Dec 8, 2025 | Completed final sign-off Jan 2026 | 199 Tiffany Av | unit 406; replace water damage floor tile resinstall (e) vanity tiolet minor drywall patching 40"x27" in hall bath.Details
unit 406; replace water damage floor tile resinstall (e) vanity tiolet minor drywall patching 40"x27" in hall bath. | $2,500 |
| Sep 11, 2025 | Completed final sign-off Nov 2025 | 3254 Octavia St | remodel one split bath (1 shower room and 1 toilet room) in kind no structural changes. no moving walls, approx 49sq ft + 56 sq ft. like for like remodel.Details
remodel one split bath (1 shower room and 1 toilet room) in kind no structural changes. no moving walls, approx 49sq ft + 56 sq ft. like for like remodel. | $65,000 |
| Feb 7, 2025 | Completed final sign-off Mar 2025 | 1270 Geneva Av | remodel one bathroom in kind. no structural changes.Details
remodel one bathroom in kind. no structural changes. | $24,000 |
| Sep 20, 2024 | Completed final sign-off Jan 2026 | 2120 Jefferson St | enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows.Details
enclose (e) covered porch at rear yard.provide (n) laundry/mud room.relocate (e) g/f bathroom w/ shower.add kitchen counter/cabinets & bar sink.new hvac & w/h.relocate (e) elec pnl.relocate (e) r-yard gate.reconfigure (e) 2 car garage.replace (e) garage doors & windows. | $40,000 |
| Aug 6, 2024 | Completed final sign-off Feb 2025 | 418 San Miguel St | remodel 1 bathroom & 1 kitchen, relocate laundry to (e) closet, create 1 powder room in (e) laundry. provide exhaust fan in powder room. kitchen and powder room lighting to comply with cec 150(k)Details
remodel 1 bathroom & 1 kitchen, relocate laundry to (e) closet, create 1 powder room in (e) laundry. provide exhaust fan in powder room. kitchen and powder room lighting to comply with cec 150(k) | $100,000 |
| Jul 9, 2024 | Completed final sign-off Aug 2024 | 180 Dorantes Av | remodel (2) bathrooms in kind no structural changes.Details
remodel (2) bathrooms in kind no structural changes. | $40,000 |
| Jul 14, 2023 | Completed final sign-off Jan 2024 | 711 Page St | revision to pa# 202304206152, dry rot repairs in bathroom #4 under windowDetails
revision to pa# 202304206152, dry rot repairs in bathroom #4 under window | $800 |
| Jul 14, 2023 | Completed final sign-off Dec 2023 | 713 Page St | revision to pa# 202304206153, replace 1 bathroom #3 window , replace 1 bedroom sliding patio doors, reframe dry rot repairs at 3 bathrooms. install new kitchen header fro widened door opening.Details
revision to pa# 202304206153, replace 1 bathroom #3 window , replace 1 bedroom sliding patio doors, reframe dry rot repairs at 3 bathrooms. install new kitchen header fro widened door opening. | $3,200 |
| Apr 20, 2023 | Completed final sign-off Dec 2023 | 713 Page St | remodel 3-bathrooms like for like within extg footprint.Details
remodel 3-bathrooms like for like within extg footprint. | $105,000 |
| Apr 20, 2023 | Completed final sign-off Dec 2023 | 711 Page St | remodel 2-bathrooms like for like within extg footprint.Details
remodel 2-bathrooms like for like within extg footprint. | $70,000 |
| May 10, 2022 | Completed final sign-off Nov 2023 | 655 Mississippi St | detached shed - convert existing detached storage building to a home office with bathroom.Details
detached shed - convert existing detached storage building to a home office with bathroom. | $40,000 |
| May 14, 2021 | Completed final sign-off Dec 2021 | 2766 22nd St | kitchen and bath remodel at level oneDetails
kitchen and bath remodel at level one | $25,000 |
| Apr 30, 2021 | Completed final sign-off Jun 2022 | 111 28th St | unit #a: residential remodel of kitchen & bath. no exterior work.Details
unit #a: residential remodel of kitchen & bath. no exterior work. | $100,000 |
| Apr 30, 2021 | Completed final sign-off Aug 2021 | 1625 Monterey Bl | remodel in kind - 2 bathrooms: 1 in attic and 1 on bedroom level. no other work proposed or authorized.Details
remodel in kind - 2 bathrooms: 1 in attic and 1 on bedroom level. no other work proposed or authorized. | $125,000 |
| Aug 24, 2020 | Completed final sign-off Sep 2022 | 47 Park Hill Av | interior renovation of a single family residence: 3 new fire rated glaze wall assemblies on south side wall, new laundry room area, reconfigured master bathroom and master closet. no change to exterior building mass.Details
interior renovation of a single family residence: 3 new fire rated glaze wall assemblies on south side wall, new laundry room area, reconfigured master bathroom and master closet. no change to exterior building mass. | $250,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 360 Liberty St | master bathroom (~11.5'x6.5') and guest bathroom (6'x6.5') remodel. replacing tile finishes on floor and shower walls. replacing floor mount toilets with wall hung toilets, replacing vanities and lights in existing locations. all work in kind.Details
master bathroom (~11.5'x6.5') and guest bathroom (6'x6.5') remodel. replacing tile finishes on floor and shower walls. replacing floor mount toilets with wall hung toilets, replacing vanities and lights in existing locations. all work in kind. | $60,000 |
| Jun 12, 2020 | Completed final sign-off Jan 2021 | 1656 18th Av | bathroom remodel: remove tub and replace with shower, replace single vanity with double vanity, replace floow mount toilet with new wall hung water saving toilet in same location.Details
bathroom remodel: remove tub and replace with shower, replace single vanity with double vanity, replace floow mount toilet with new wall hung water saving toilet in same location. | $10,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2020 | 333 Grant Av | unit #502: replace countertops in kitchen and 2 bathroom vanities, replace 2 vanity faucets and and 1 kitchen faucet, reface kitchen cabinets, replace 2 lights fixtures in existing location, replace bedroom carpet. all work in kind.Details
unit #502: replace countertops in kitchen and 2 bathroom vanities, replace 2 vanity faucets and and 1 kitchen faucet, reface kitchen cabinets, replace 2 lights fixtures in existing location, replace bedroom carpet. all work in kind. | $75,000 |