Back to bathroom remodel contractors
Nails & Wood Builder's Inc
- Based in
- San Pablo
- On San Francisco permits
- Oct 2019 to Sep 2024
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 4 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2023 | Completed final sign-off May 2023 | 3501 Laguna St | remodel bathroom and kitchen in kindDetails
remodel bathroom and kitchen in kind | $35,000 |
| Nov 4, 2021 | Completed final sign-off Jul 2022 | 1061 Oak St | replace drywall in entire unit, new interior doors (same size and location), remodel two baths, remodel one kitchen, replace central heater, new electrical and replace flooring. all non-structural work: alteration (sfebc section 503.11.1) applies.Details
replace drywall in entire unit, new interior doors (same size and location), remodel two baths, remodel one kitchen, replace central heater, new electrical and replace flooring. all non-structural work: alteration (sfebc section 503.11.1) applies. | $50,000 |
| Oct 24, 2019 | Expired or cancelled withdrawn Nov 2019 | 1063 Oak St | renovate 3 units kitchen and bath removel. 3rd fl renovate existing bathroom, add a full bathroom 3rd fl, relocate kitchen, drywall, electrical, plumbing, remove some structural walls. tankless water heater, replace windowsDetails
renovate 3 units kitchen and bath removel. 3rd fl renovate existing bathroom, add a full bathroom 3rd fl, relocate kitchen, drywall, electrical, plumbing, remove some structural walls. tankless water heater, replace windows | $50,000 |