N A Construction
- Based in
- Danville
- On San Francisco permits
- Sep 2010 to Sep 2010
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 never finaled. Typically 27 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2010 | Never finaled issued Oct 2010, no final | 372 Santa Clara Av | repair exterior stucco, one wall, 1000 sq ft approx. remove and replace 6 windows and 2 sliding doors, remove and replace a wood deck (64 sq ft), install plywood shear walls in basement.Details
repair exterior stucco, one wall, 1000 sq ft approx. remove and replace 6 windows and 2 sliding doors, remove and replace a wood deck (64 sq ft), install plywood shear walls in basement. | $38,400 |