Munoz Villa Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2025 to Aug 2026
- Last 24 months
- 9 permits filed
9 permits since 2000: 4 completed, 5 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 in progress. Typically 98 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2025 | In progress issued Jul 2026 | 341 Park St | rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights.Details
rear and side addition, a notch in the building side for a lightwell, a rear yeard deck at the ground level with a retractable awning and enclosed rain barrels, wideniing the existing garage door and west driveway, and interior remodeling with new windows and exterior doors and skylights. | $600,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 2 Massasoit St | front of the house deck to repair small dry rot in kind less then 50%Details
front of the house deck to repair small dry rot in kind less then 50% | $1,500 |