Back to bathroom remodel contractors
Munoz Construction
- Based in
- Vallejo
- On San Francisco permits
- Dec 2013 to Mar 2019
- Last 24 months
- 0 permits filed
14 permits since 2000: 9 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 2 completed, 3 never finaled. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 12, 2019 | Never finaled issued Mar 2019, no final | 621 Waller St | 2 bathroom remodel, remove sheetrock, reframe door opening, replumbing, electrical insulation and sheetrock. no structural work under this permit. all interior work.Details
2 bathroom remodel, remove sheetrock, reframe door opening, replumbing, electrical insulation and sheetrock. no structural work under this permit. all interior work. | $35,000 |
| Mar 29, 2017 | Completed final sign-off Jun 2017 | 64 Carver St | install one bathroom window, one window in kitchen back wass. install window one at the back bedroom all replacementsDetails
install one bathroom window, one window in kitchen back wass. install window one at the back bedroom all replacements | $3,500 |
| Mar 20, 2017 | Completed final sign-off Jun 2017 | 64 Carver St | remodel kitchen & (1) bathroom, change plumbing in each.Details
remodel kitchen & (1) bathroom, change plumbing in each. | $41,500 |
| May 18, 2016 | Never finaled issued May 2016, no final | 269 Joost Av | bathroom remodel plumbing and electrical.Details
bathroom remodel plumbing and electrical. | $20,000 |
| Dec 30, 2013 | Never finaled issued Dec 2015, no final | 621 Waller St | - street level: no work. - main level: remodel kitchen, replace (e) doors & windows, eliminate fire place & 1/2 bath. - uppe level: replace (e) french door & guardrails - attic: no work.Details
- street level: no work. - main level: remodel kitchen, replace (e) doors & windows, eliminate fire place & 1/2 bath. - uppe level: replace (e) french door & guardrails - attic: no work. | $200,000 |