Permit GraphShortlistSan Francisco building permits since 2000

Munayer Construction

Contractor license
930090
State license record
Based in
Daly City
On San Francisco permits
Mar 2024 to Aug 2026
Last 24 months
12 permits filed

13 permits since 2000: 5 completed, 7 in progress, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 9

9 bathroom remodel permits: 4 completed, 4 in progress, 1 expired or cancelled. Typically 1 days from filing to permit and 64 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Aug 21, 2026In progress
issued Aug 2026
88 King Stunit 612 remodeling 2 bathrooms. bathroom 1: tub to standup shower conversion. and bedroom floors carpet to lvp. paint room, change toilet and new powered medicine cabinet wall mounted. bathroom 2: like for like . placing new tiles, keeping the tub but replacing plumbing fixtures same location.
Details
Permit
202608217022
Status
filed
Filed
Aug 21, 2026
Permit issued
Aug 21, 2026
Declared cost
$55,000
Address
88 King St

unit 612 remodeling 2 bathrooms. bathroom 1: tub to standup shower conversion. and bedroom floors carpet to lvp. paint room, change toilet and new powered medicine cabinet wall mounted. bathroom 2: like for like . placing new tiles, keeping the tub but replacing plumbing fixtures same location.

Open the permit page

$55,000
Jul 28, 2026In progress
filed Jul 2026, not yet issued
31 Gaviota Wyremodel a bathroom upstairs in kind except tub to shower pan with curb conversion. no drains to be moved only new diverter box for new shower fixtures. adding a heated towel rack. approx. 42 sq ft. add new exhaust fan.
Details
Permit
202607285703
Status
filed
Filed
Jul 28, 2026
Declared cost
$32,000
Address
31 Gaviota Wy

remodel a bathroom upstairs in kind except tub to shower pan with curb conversion. no drains to be moved only new diverter box for new shower fixtures. adding a heated towel rack. approx. 42 sq ft. add new exhaust fan.

Open the permit page

$32,000
Feb 20, 2026Completed
final sign-off Apr 2026
17 Warren Drwork is seperate from 202511109313: remodel of bathroom 2nd flr hallway before master bedroom. remodel stand up shower like for like, changing counter top, sink, ceiling fan, lights,vanity lights, replacing toilet, new drywall and purple xp drywall. denshield wall board water proofing.
Details
Permit
202602206291
Status
complete
Filed
Feb 20, 2026
Permit issued
Feb 20, 2026
Final sign-off
Apr 29, 2026
Declared cost
$22,000
Address
17 Warren Dr

work is seperate from 202511109313: remodel of bathroom 2nd flr hallway before master bedroom. remodel stand up shower like for like, changing counter top, sink, ceiling fan, lights,vanity lights, replacing toilet, new drywall and purple xp drywall. denshield wall board water proofing.

Open the permit page

$22,000
Nov 10, 2025Completed
final sign-off Feb 2026
17 Warren Drremodeling existing bathroom like for like with exception to transforming existing tub to a standup shower format. installing a new fan with a light on ceiling. installing one new outlet for use in toilet area.
Details
Permit
202511109313
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 12, 2025
Final sign-off
Feb 27, 2026
Declared cost
$24,000
Address
17 Warren Dr

remodeling existing bathroom like for like with exception to transforming existing tub to a standup shower format. installing a new fan with a light on ceiling. installing one new outlet for use in toilet area.

Open the permit page

$24,000
Aug 13, 2025In progress
issued Aug 2025
445 Francisco Stunit 103: remodeling of bathroom including tiles, replacing of plumbing, and electrical fixtures, drywall and and painting, tub to be replaced with shower.
Details
Permit
202508132985
Status
issued
Filed
Aug 13, 2025
Permit issued
Aug 15, 2025
Declared cost
$24,000
Address
445 Francisco St

unit 103: remodeling of bathroom including tiles, replacing of plumbing, and electrical fixtures, drywall and and painting, tub to be replaced with shower.

Open the permit page

$24,000
Aug 8, 2025Expired or cancelled
withdrawn Aug 2025
445 Francisco Stbathroom like for like tub to stand up shower conversiom. replace (e) ceiling fan w/ new unit and recessed lights. install new recessed waterproof ceiling light and shower pan area. new toilet, vanity cab, vanity mirror, vanity lights, new tiles on 42 sq. ft. floors & new tiles behind vanity 48 sq.
Details
Permit
202508082694
Status
withdrawn
Filed
Aug 8, 2025
Declared cost
$24,000
Address
445 Francisco St

bathroom like for like tub to stand up shower conversiom. replace (e) ceiling fan w/ new unit and recessed lights. install new recessed waterproof ceiling light and shower pan area. new toilet, vanity cab, vanity mirror, vanity lights, new tiles on 42 sq. ft. floors & new tiles behind vanity 48 sq.

Open the permit page

$24,000
Feb 12, 2025Completed
final sign-off Apr 2025
307 Banks Stconverting tub bathroom into standup shower. install tile floor, install new niche and curb, install new toilet vanity and vanity light and new mirror. install wall mount cabinets for storage above toilet. install new radiant heating on floor. install new shower wall valves and waterproofing surroun
Details
Permit
202502120229
Status
complete
Filed
Feb 12, 2025
Permit issued
Feb 18, 2025
Final sign-off
Apr 18, 2025
Declared cost
$22,000
Address
307 Banks St

converting tub bathroom into standup shower. install tile floor, install new niche and curb, install new toilet vanity and vanity light and new mirror. install wall mount cabinets for storage above toilet. install new radiant heating on floor. install new shower wall valves and waterproofing surroun

Open the permit page

$22,000
Jan 21, 2025In progress
issued Jan 2025
77 Norton Stinstall 5 new windows to replace (e) windows. reduce size of bathroom windows, new siding to match (e). install new low-e block frame windows. additional work to pa 202410092678. all windows not street visible.
Details
Permit
202501218747
Status
issued
Filed
Jan 21, 2025
Permit issued
Jan 22, 2025
Declared cost
$1,000
Address
77 Norton St

install 5 new windows to replace (e) windows. reduce size of bathroom windows, new siding to match (e). install new low-e block frame windows. additional work to pa 202410092678. all windows not street visible.

Open the permit page

$1,000
Oct 9, 2024Completed
final sign-off Nov 2024
2185 Bush Stunit #316: remodel (e) bathroom (45 sq ft) w/ new floor and wall tiles, new shower valve fixtures w/ diverter, new toilet, new vanity w/ countertop and vanity light; new fan light w/ new sensor switches and new gfci outlet on (e) gfci line. tub to remain. all drains remain. vanity plumbing remains.
Details
Permit
202410092677
Status
complete
Filed
Oct 9, 2024
Permit issued
Oct 9, 2024
Final sign-off
Nov 6, 2024
Declared cost
$16,500
Address
2185 Bush St

unit #316: remodel (e) bathroom (45 sq ft) w/ new floor and wall tiles, new shower valve fixtures w/ diverter, new toilet, new vanity w/ countertop and vanity light; new fan light w/ new sensor switches and new gfci outlet on (e) gfci line. tub to remain. all drains remain. vanity plumbing remains.

Open the permit page

$16,500