Back to bathroom remodel contractors
Mueller Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Jun 2026
- Last 24 months
- 1 permit filed
35 permits since 2000: 26 completed, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 3 days from filing to permit and 240 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2022 | Completed final sign-off Sep 2024 | 239 Molimo Dr | demo extg stair from 2nd floor to the 1st floor. construct new stairs. demo extg posts and beams on 1st floor. replace per structural design. new window and door, new full bath and extended framing and new retaining walls on 1st floor. new family room and office at 1st floor - new conditioned spaceDetails
demo extg stair from 2nd floor to the 1st floor. construct new stairs. demo extg posts and beams on 1st floor. replace per structural design. new window and door, new full bath and extended framing and new retaining walls on 1st floor. new family room and office at 1st floor - new conditioned space | $85,000 |
| Oct 20, 2020 | Completed final sign-off Jan 2021 | 47 Arroyo Wy | bathroom remodel - relocate door, remove non-bearing wall, new shower pan, shower fixture, vanity & sink, new fan & lightsDetails
bathroom remodel - relocate door, remove non-bearing wall, new shower pan, shower fixture, vanity & sink, new fan & lights | $12,000 |
| Apr 11, 2019 | Completed final sign-off May 2019 | 47 Topaz Wy | small lower bath remodel, relocate vanity, relocate door, relocate elec switches and gfi, change stair landing to 3 point turnDetails
small lower bath remodel, relocate vanity, relocate door, relocate elec switches and gfi, change stair landing to 3 point turn | $2,000 |
| Dec 6, 2018 | Completed final sign-off Jan 2021 | 47 Gaviota Wy | relocate kitchen, fill in lightwell, remodel (e) bathroom, add (n) bathroom, recongigure stairs, add deck at rear yard, misc, interior improvementDetails
relocate kitchen, fill in lightwell, remodel (e) bathroom, add (n) bathroom, recongigure stairs, add deck at rear yard, misc, interior improvement | $175,790 |
| Jan 16, 2018 | Completed final sign-off Sep 2018 | 551 Bella Vista Wy | interior remodel converting 550 sq ft of unconditioned 1st floor space to conditioned space. includes new bedroom, bathroom, media room, & laundry area.Details
interior remodel converting 550 sq ft of unconditioned 1st floor space to conditioned space. includes new bedroom, bathroom, media room, & laundry area. | $50,000 |
| Mar 27, 2017 | Completed final sign-off Mar 2018 | 506 Bella Vista Wy | revision to application # 201611223346. add full bath full bath upstairs 2nd floor which was approved and shown on approved plans instead of "half bath" on the application form.Details
revision to application # 201611223346. add full bath full bath upstairs 2nd floor which was approved and shown on approved plans instead of "half bath" on the application form. | |
| Nov 22, 2016 | Completed final sign-off Mar 2018 | 506 Bella Vista Wy | add bedroom & bath at 1st floor, minor kitchen remodel, add 1/2 bath upstairsDetails
add bedroom & bath at 1st floor, minor kitchen remodel, add 1/2 bath upstairs | $30,000 |
| Nov 14, 2016 | Completed final sign-off Jun 2019 | 407 Banks St | addition of bathroom on ground floor.Details
addition of bathroom on ground floor. | $12,000 |
| Oct 11, 2016 | Completed final sign-off Jun 2017 | 58 Bronte St | to comply with nov 201639106 - front stair dry rot repair, less than 50%, replace sheet rock; legalize attic space. kitchen & bathrooms (2) remodel.Details
to comply with nov 201639106 - front stair dry rot repair, less than 50%, replace sheet rock; legalize attic space. kitchen & bathrooms (2) remodel. | $20,000 |
| May 26, 2016 | Completed final sign-off Sep 2016 | 748 Noriega St | bathroom remodel at top floor. install pocket doorDetails
bathroom remodel at top floor. install pocket door | $6,000 |