Back to bathroom remodel contractors
Muddyorange Fabrication
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Jan 2022
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 0 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 24, 2022 | Completed final sign-off Nov 2022 | 227 Ashbury St | remodel 1 kitchen and bath in kind.Details
remodel 1 kitchen and bath in kind. | $20,000 |
| Jul 26, 2019 | Completed final sign-off Dec 2019 | 40 Piedmont St | add half bath (toilet and vanity) to 1st flrDetails
add half bath (toilet and vanity) to 1st flr | $12,000 |
| Apr 24, 2018 | Completed final sign-off Apr 2021 | 111 Holly Park Cr | legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair.Details
legalize unpermitted extg 1st floor addition w/ rec room @ rear of building, and add (n) bathroom. rebuild unpermitted exit stair, deck and landing to code. dry rot repair. | $138,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 435 Magellan Av | bathroom remodel - replace toilet, vanity, shower; install new tile, recessed lighting, storage cabinet; replace shower valve & fixtures, install glass shower surround, vanity mirror; paint. no structural work, no wall modification.Details
bathroom remodel - replace toilet, vanity, shower; install new tile, recessed lighting, storage cabinet; replace shower valve & fixtures, install glass shower surround, vanity mirror; paint. no structural work, no wall modification. | $15,000 |
| Mar 2, 2015 | Completed final sign-off Jul 2015 | 40 Piedmont St | 3rd flr - bathroom remodel - no additional fixtures. room division: 1 large room into 2 seperate bedrooms. window replacement (9) in (e) window locations.Details
3rd flr - bathroom remodel - no additional fixtures. room division: 1 large room into 2 seperate bedrooms. window replacement (9) in (e) window locations. | $20,000 |
| Aug 1, 2014 | Completed final sign-off Oct 2014 | 670 Commercial St | revision to permit 201405075115; add ventilation fan in bathroom, add louvers above entry door and in bathroom door.Details
revision to permit 201405075115; add ventilation fan in bathroom, add louvers above entry door and in bathroom door. | $1,000 |