Back to bathroom remodel contractors
Mtzwest Engineering Co
- Based in
- Vallejo
- On San Francisco permits
- Apr 2015 to Sep 2026
- Last 24 months
- 2 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 1 days from filing to permit and 43 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2015 | Completed final sign-off Jun 2015 | 762 Great Hy | replace (e) kitchen cabinets, install new countertop, new appliances, install new ceiling fan in living room, install new tile in hallway master bath with one sink in master and 2 sinks in hallway bath. no walls moved/removed or added. all layouts to rmain unchanged.Details
replace (e) kitchen cabinets, install new countertop, new appliances, install new ceiling fan in living room, install new tile in hallway master bath with one sink in master and 2 sinks in hallway bath. no walls moved/removed or added. all layouts to rmain unchanged. | $15,000 |