Back to bathroom remodel contractors
Mountain Top Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2020 to Sep 2026
- Last 24 months
- 9 permits filed
80 permits since 2000: 65 completed, 3 in progress, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 5 are 3 to 5 years old, 5 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 38 completed, 2 in progress, 4 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 118 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Sep 2026 | 1200 California St | #24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets,Details
#24c: new closet in 2nd bedroom, new kitchen cabinetry appliances & fixtures, remodel primary guest bath, replace fixtures, cabinetry & finishes, new office/guest room door, add w/d to closet space & add new doors, new built ins in livingroom & enclose structural 1 beam, add new doors in closets, | $160,000 |
| Mar 24, 2026 | Completed final sign-off Jul 2026 | 318 Spear St | unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like.Details
unit 8a: remodel 3 bathrooms. tub to shower in master bath. 1 kitchen like for like. | $80,000 |
| Feb 25, 2026 | In progress issued Aug 2026 | 2262 Pine St | addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only.Details
addition and interior alts: 2-story rear yard addition. remodel to (e) kitchens and bathrooms. new bathrom on 1/f & 2/f. structural changes to basement only. | $299,000 |
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 1278 47th Av | split master bathroom into 2 bathrooms and relocate master walk in closet. no additional square footage.Details
split master bathroom into 2 bathrooms and relocate master walk in closet. no additional square footage. | $60,000 |
| Aug 21, 2025 | Completed final sign-off Dec 2025 | 1630 Greenwich St | full bathroom remodel.Details
full bathroom remodel. | $25,000 |
| May 22, 2024 | Completed final sign-off Jun 2025 | 278 28th Av | revision to 202211297266. add site drainage at backyard. reconfigure master bath and middle bedroom at 2nd fl. replace furnace with new furnace and heat pump. add laundry room to basementDetails
revision to 202211297266. add site drainage at backyard. reconfigure master bath and middle bedroom at 2nd fl. replace furnace with new furnace and heat pump. add laundry room to basement | $30,000 |
| Feb 29, 2024 | Completed final sign-off Apr 2024 | 1970 Scott St | unit 2: bathroom renaovation, tub to shower conversion same location, new sink toilet and shower valve. no layout changeDetails
unit 2: bathroom renaovation, tub to shower conversion same location, new sink toilet and shower valve. no layout change | $20,000 |
| Sep 19, 2023 | Completed final sign-off Jan 2024 | 1831 14th Av | demolish (e) powder room and (e) kitchenette walls, add shower and new partiton wall in (e) powder room resulting in (n) bath replace (n) bath window, replace kitchenette counter top and appliancesDetails
demolish (e) powder room and (e) kitchenette walls, add shower and new partiton wall in (e) powder room resulting in (n) bath replace (n) bath window, replace kitchenette counter top and appliances | $50,000 |
| Aug 22, 2023 | Completed final sign-off Mar 2024 | 2125 Bryant St | 3 bathroom remodels. bathroom 1: like to like shower. bathroom 2: like to like shower. bathroom 3: like to like tub to shower.Details
3 bathroom remodels. bathroom 1: like to like shower. bathroom 2: like to like shower. bathroom 3: like to like tub to shower. | $68,000 |
| Aug 22, 2023 | Completed final sign-off Nov 2023 | 355 01st St | bathroom remodel - partial. replace tub, tile, adde niche, replace countertop, sink, faucet, and mirror. unit #s1603.Details
bathroom remodel - partial. replace tub, tile, adde niche, replace countertop, sink, faucet, and mirror. unit #s1603. | $15,000 |
| May 8, 2023 | Completed final sign-off Oct 2023 | 720 York St | unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes.Details
unit 201: (1) 43 sq ft (main) bathroom remodel on 2nd floor in kind. no changers to walls or openings. (n) curbed shower, toilet, and vanity. all (n) fixtures and finishes. | $29,000 |
| Apr 17, 2023 | Completed final sign-off Aug 2023 | 185 Graystone Tr | bathroom remodel in-kind with curbed shower. no new fixtures. (unit#5)Details
bathroom remodel in-kind with curbed shower. no new fixtures. (unit#5) | $25,000 |
| Apr 17, 2023 | Completed final sign-off Jun 2023 | 1255 Oak St | unit# 1: bathroom remodel- convert tub to curbed shower, wall mounted toilet, install towel heater rod. no new fixtures.Details
unit# 1: bathroom remodel- convert tub to curbed shower, wall mounted toilet, install towel heater rod. no new fixtures. | $25,000 |
| Feb 9, 2023 | Completed final sign-off Mar 2023 | 720 York St | one bathroom romodel in kind. replace tub with new tub. non structuralDetails
one bathroom romodel in kind. replace tub with new tub. non structural | $25,000 |
| Jan 25, 2023 | Completed final sign-off Apr 2023 | 1444 Vallejo St | #3. bathroom remodel like for like new shower fixtures, shower door, new tiles with shower pan , new toilet , new vanity light fixtures.Details
#3. bathroom remodel like for like new shower fixtures, shower door, new tiles with shower pan , new toilet , new vanity light fixtures. | $20,000 |
| Dec 20, 2022 | Completed final sign-off Mar 2023 | 560 14th St | one bathroom remodel, like for like. one toilet room remodelDetails
one bathroom remodel, like for like. one toilet room remodel | $35,000 |
| Nov 29, 2022 | Completed final sign-off Jun 2025 | 278 28th Av | build a 3 story rear addition,kitchen interior remodel and master bathroom remodel.Details
build a 3 story rear addition,kitchen interior remodel and master bathroom remodel. | $700,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2023 | 701 Minna St | apt #1 - bathroom remodel, new shower. no wall demo, same layoutDetails
apt #1 - bathroom remodel, new shower. no wall demo, same layout | $20,000 |
| Nov 1, 2022 | Completed final sign-off Apr 2023 | 686 Guerrero St | unit #2 - 2nd flr: interior remodel of existing kitchen & laundry room. remove (2) existing windows & replace with one larger window at rear. remodel existing bathroom "in-kind".Details
unit #2 - 2nd flr: interior remodel of existing kitchen & laundry room. remove (2) existing windows & replace with one larger window at rear. remodel existing bathroom "in-kind". | $30,000 |
| Sep 27, 2022 | Completed final sign-off Nov 2022 | 255 Red Rock Wy | bathroom remodel in kind, replace tub, toilet, vanity and sink, med. cabinet, light and plumbing fixtures. removing asbetos in same location. (asbestos abatement to be performed by c-22 contractor)Details
bathroom remodel in kind, replace tub, toilet, vanity and sink, med. cabinet, light and plumbing fixtures. removing asbetos in same location. (asbestos abatement to be performed by c-22 contractor) | $28,000 |
| Apr 27, 2022 | Never finaled issued Apr 2022, no final | 1200 Gough St | 1 like for like bathroom. replace livingroom and entry flooring plank.Details
1 like for like bathroom. replace livingroom and entry flooring plank. | $20,000 |
| Apr 27, 2022 | Completed final sign-off Aug 2022 | 6 Scenic Wy | remodel (1) kitchen like for like and (1) bath like for likeDetails
remodel (1) kitchen like for like and (1) bath like for like | $46,000 |
| Apr 19, 2022 | Completed final sign-off Nov 2022 | 554 23rd Av | like for like one bathroom remodel. 2 new recessed lights. adding a free standing tub.Details
like for like one bathroom remodel. 2 new recessed lights. adding a free standing tub. | $32,500 |
| Jan 18, 2022 | Completed final sign-off Jun 2022 | 1830 Fillmore St | unit 217: complete one bathroom remodel like for likeDetails
unit 217: complete one bathroom remodel like for like | $30,000 |
| Dec 8, 2021 | Completed final sign-off Jun 2022 | 312 19th Av | 2nd floor - 2 bathrooms remodel like to like, 5'x10' and 5'x8'.Details
2nd floor - 2 bathrooms remodel like to like, 5'x10' and 5'x8'. | $48,000 |
| Nov 9, 2021 | Completed final sign-off Apr 2023 | 2242 48th Av | 2 bathroom remodel, kitchen remodel @ 2nd flDetails
2 bathroom remodel, kitchen remodel @ 2nd fl | $170,000 |
| Sep 30, 2021 | Completed final sign-off Oct 2021 | 3239 Mission St | unit 5: replace two toilet seats with toilet seats with bidet feature. add water line for bidet, add outlet for bidet, patch and paint wall. work in two bathrooms.Details
unit 5: replace two toilet seats with toilet seats with bidet feature. add water line for bidet, add outlet for bidet, patch and paint wall. work in two bathrooms. | $5,000 |
| Aug 11, 2021 | Completed final sign-off Mar 2022 | 623 Spruce St | one bathroom remodel like to like. replace tub with walk-in shower. h.e. lightingDetails
one bathroom remodel like to like. replace tub with walk-in shower. h.e. lighting | $18,000 |
| Jun 18, 2021 | Completed final sign-off Feb 2022 | 2579 37th Av | relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets.Details
relocate bathroom. install 2 windows (not facing street). build another bedroom with 2 closets. | $45,000 |
| May 19, 2021 | Completed final sign-off Sep 2021 | 1750 Taylor St | unit #202: 2 bathrooms remodel. 1st bathroom: like to like, shower. 2nd bathroom: like to like, converting tub to walk-in shower.Details
unit #202: 2 bathrooms remodel. 1st bathroom: like to like, shower. 2nd bathroom: like to like, converting tub to walk-in shower. | $40,000 |
| Apr 13, 2021 | Completed final sign-off Aug 2021 | 861 Lombard St | bathroom remodel in kind. replace tub with shower. replace 1 window at rear. toilet room remodel like to like. kitchen remodel like to like. no change in layout or walls & opening.Details
bathroom remodel in kind. replace tub with shower. replace 1 window at rear. toilet room remodel like to like. kitchen remodel like to like. no change in layout or walls & opening. | $60,000 |
| Mar 16, 2021 | Never finaled issued Mar 2021, no final | 555 04th St | like to like bathroom remodel. create showerpan. install 3 new recess lights.Details
like to like bathroom remodel. create showerpan. install 3 new recess lights. | $16,000 |
| Feb 2, 2021 | Completed final sign-off Mar 2021 | 4763 18th St | reinstall and remodel existing bathroom where fixtures were removed without pemrit. no change to (e) plumbing in place.Details
reinstall and remodel existing bathroom where fixtures were removed without pemrit. no change to (e) plumbing in place. | $20,000 |
| Dec 3, 2020 | Never finaled issued Dec 2020, no final | 3731 Fillmore St | unit 5: replacing window in bathroom, same size/retrofitDetails
unit 5: replacing window in bathroom, same size/retrofit | $500 |
| Nov 18, 2020 | Completed final sign-off Feb 2021 | 1129 Broderick St | complete bathroom remodel. relocate plumbing. switch tub and vanity.Details
complete bathroom remodel. relocate plumbing. switch tub and vanity. | $18,000 |
| Nov 18, 2020 | Completed final sign-off Oct 2025 | 933 Wisconsin St | retrofit window vinyl facing the left siding of the property (non street facing). expand bathroom window located on left siding of property. extg measurements are 2'x1'. we will expand the bottom by 1'. the heather will remain.Details
retrofit window vinyl facing the left siding of the property (non street facing). expand bathroom window located on left siding of property. extg measurements are 2'x1'. we will expand the bottom by 1'. the heather will remain. | $3,000 |
| Nov 12, 2020 | Completed final sign-off Oct 2025 | 933 Wisconsin St | 2 bathrooms remodeling like to likeDetails
2 bathrooms remodeling like to like | $43,000 |
| Oct 27, 2020 | Completed final sign-off Dec 2020 | 1450 Greenwich St | #404: bathroom remodel in kind.Details
#404: bathroom remodel in kind. | $17,000 |
| Oct 8, 2020 | Completed final sign-off Mar 2021 | 1860 Ellis St | bathroom remodel like to like. bathroom remodel like to like. adding four recessed lights in kitchen. no change in layoutDetails
bathroom remodel like to like. bathroom remodel like to like. adding four recessed lights in kitchen. no change in layout | $45,000 |
| Oct 8, 2020 | Completed final sign-off Dec 2020 | 3731 Fillmore St | bathroom remodeling. removing tub and toilet. no change in layoutDetails
bathroom remodeling. removing tub and toilet. no change in layout | $18,000 |
| Sep 25, 2020 | Completed final sign-off Jan 2021 | 4650 18th St | bathroom remodeling line to line. add an outlet in bathroom, add recessed light in bathroomDetails
bathroom remodeling line to line. add an outlet in bathroom, add recessed light in bathroom | $20,000 |
| Jul 29, 2020 | Never finaled issued Jul 2020, no final | 479 Orizaba Av | bathroom remodel. change sliding door to a window in existing opening.Details
bathroom remodel. change sliding door to a window in existing opening. | $25,000 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 258 28th Av | replace 1 window in the bathroom, same size. replace 1 window in bath with a smaller windowDetails
replace 1 window in the bathroom, same size. replace 1 window in bath with a smaller window | $3,500 |
| Feb 26, 2020 | Completed final sign-off Jun 2020 | 258 28th Av | remodel bathroom, in-kind.Details
remodel bathroom, in-kind. | $20,000 |
| Feb 26, 2020 | Expired or cancelled cancelled Jan 2026 | 258 28th Av | bathroom remodeling like to like - replace tub to shower, make 1 window smaller, replace another window, same location & replace tile, window is not visible from street, add outlet to bathroom.Details
bathroom remodeling like to like - replace tub to shower, make 1 window smaller, replace another window, same location & replace tile, window is not visible from street, add outlet to bathroom. | $22,000 |