Back to bathroom remodel contractors
Mount Street Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2021 to Aug 2025
- Last 24 months
- 3 permits filed
10 permits since 2000: 7 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2025 | In progress issued Dec 2025 | 943 Sanchez St | units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unitDetails
units 943 and 945- construct 3 stop elevator at north lightwell. construct deck and firewall at south light well. replace rear deck rail; and stair to grade. interior remodel at both units include (e) kitchen , 2 full bathrooms, and powder room at each unit. (n) skylight at upper unit | $700,000 |
| Jul 30, 2025 | Completed final sign-off Nov 2025 | 5 Las Villas Ct | like for like bathroom remodel.Details
like for like bathroom remodel. | $20,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 378 Chestnut St | 2 bathroom remodels like for likeDetails
2 bathroom remodels like for like | $60,000 |
| Oct 31, 2023 | Completed final sign-off Dec 2023 | 3192 Sacramento St | remodel bathroom & laundry hook ups, new wiring in bathroomDetails
remodel bathroom & laundry hook ups, new wiring in bathroom | $55,000 |
| Nov 23, 2022 | Never finaled issued Nov 2022, no final | 2101 Baker St | unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural.Details
unit #3: remodel bathroom- toilet same location, sink same and replace tub with shower stall. non structural. | $15,000 |
| Aug 16, 2022 | Completed final sign-off Oct 2022 | 1070 Green St | unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom.Details
unit 103: remodel bathroom remove and replace sink countertop, tiolet, and tub/ shower valve, new fan and light switches, tile walls in tub/ shower and floor throughout bathroom. | $5,000 |