Permit GraphShortlistSan Francisco building permits since 2000

Morrow Electrical

Contractor license
995693
State license record
Based in
San Francisco
On San Francisco permits
Feb 2016 to Mar 2016
Last 24 months
0 permits filed

4 permits since 2000: 4 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllBathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 21 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Mar 21, 2016Completed
final sign-off Apr 2016
274 Shotwell Strevision to ref pa 2016 0202 8646: replace (e) sub panel with new 70 amp 220 volt panel. add 8 new duplex recp/ add occupancy sensor switch to (e) bathroom light. add occupancu sensor and switches to (e) lighting in stroage area.
Details
Permit
201603212614
Status
complete
Filed
Mar 21, 2016
Permit issued
Mar 21, 2016
Final sign-off
Apr 11, 2016
Declared cost
$2,400
Address
274 Shotwell St

revision to ref pa 2016 0202 8646: replace (e) sub panel with new 70 amp 220 volt panel. add 8 new duplex recp/ add occupancy sensor switch to (e) bathroom light. add occupancu sensor and switches to (e) lighting in stroage area.

Open the permit page

$2,400