Mora Custom Builder Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2019 to Aug 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 4 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 25 days from filing to permit and 345 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2024 | Completed final sign-off Sep 2025 | 3759 16th St | deck @ 2nd floor & 3rd fl. dry rotted repair 4 existing 6 x 12 beam. replace existing decking w/4x6 redwood decking. replace existing wooden rail w/glass railingDetails
deck @ 2nd floor & 3rd fl. dry rotted repair 4 existing 6 x 12 beam. replace existing decking w/4x6 redwood decking. replace existing wooden rail w/glass railing | $15,000 |