Back to bathroom remodel contractors
Mooney Builder
- Based in
- San Francisco
- On San Francisco permits
- Aug 2021 to Sep 2025
- Last 24 months
- 1 permit filed
8 permits since 2000: 7 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 0 days from filing to permit and 409 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 5, 2025 | Completed final sign-off Jan 2026 | 401 Belvedere St | bathroom remodel in kind, tiling, vanity, toilet, painting.Details
bathroom remodel in kind, tiling, vanity, toilet, painting. | $15,000 |
| May 19, 2022 | Completed final sign-off Aug 2023 | 2 Gaviota Wy | revision to permit 202201256566. (e) tree at front yard shall stay. add new gas fireplace. revise bathroom layouts.Details
revision to permit 202201256566. (e) tree at front yard shall stay. add new gas fireplace. revise bathroom layouts. | |
| Jan 25, 2022 | Completed final sign-off Aug 2023 | 2 Gaviota Wy | remodel at both level. remodel (e) kitchen and (3) bathrooms. replace (e) furnache and water heater. add 375sf habitable space on the ground floor. widen (e) grage door to 9ft. close (e) window and move (e) window on the north elevation, visible from street. close (e) skylight.Details
remodel at both level. remodel (e) kitchen and (3) bathrooms. replace (e) furnache and water heater. add 375sf habitable space on the ground floor. widen (e) grage door to 9ft. close (e) window and move (e) window on the north elevation, visible from street. close (e) skylight. | $160,000 |
| Jan 6, 2022 | Completed final sign-off Aug 2023 | 2 Gaviota Wy | bathroom remodel in-kind upstairs, no walls movedDetails
bathroom remodel in-kind upstairs, no walls moved | $25,000 |
| Aug 30, 2021 | Completed final sign-off Nov 2021 | 747 Filbert St | bathroom renovation no moving wallsDetails
bathroom renovation no moving walls | $20,000 |