Back to bathroom remodel contractors
Montgomery Sansome Lp
- Based in
- South San Francisco
- On San Francisco permits
- Jan 2000 to Nov 2024
- Last 24 months
- 1 permit filed
173 permits since 2000: 97 completed, 1 in progress, 12 never finaled, 63 expired or cancelled.
Of the 12 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 16 completed, 9 expired or cancelled. Typically 0 days from filing to permit and 346 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2024 | Expired or cancelled withdrawn Sep 2025 | 1505 Quesada Av | compliance with nov 202425674- replace fire damaged areas to original condition, kitchen bathrooms, bedrooms, porch, roof, framing , finishes work. no work is vivisble from street and all work is in 2025Details
compliance with nov 202425674- replace fire damaged areas to original condition, kitchen bathrooms, bedrooms, porch, roof, framing , finishes work. no work is vivisble from street and all work is in 2025 | $500,000 |
| Dec 15, 2023 | Expired or cancelled withdrawn Mar 2026 | 222 Byxbee St | repair fire damage rafters, ceiling joists & new truss, rewire whole bldg. r/r plumbing upstairs bathroom, 1-forced air furnace, water heater, 1200 sqft drywall, install new roof, install insulation at walls & roof & r15 walls,r30 roof, & outside walls/roof. kitchen remodel. framing appx 400 ft boarDetails
repair fire damage rafters, ceiling joists & new truss, rewire whole bldg. r/r plumbing upstairs bathroom, 1-forced air furnace, water heater, 1200 sqft drywall, install new roof, install insulation at walls & roof & r15 walls,r30 roof, & outside walls/roof. kitchen remodel. framing appx 400 ft boar | $50,000 |
| Jan 17, 2023 | Completed final sign-off Apr 2024 | 4528 17th St | replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635Details
replace 1220 sf. drywall, 80x68 sliding dr, 300 sf.cement fiber siding, kitchen cabinets, countertops, tub splash in 1st flr bathrm. replace (1) toilet, (1) bath vanity 12 plugs, 6 light outlet, 6 switches, 2 inter doors. recoat 2 decks w/ flastower. replace handwood fl.to comply with nov# 202298635 | $300,000 |
| Nov 8, 2019 | Completed final sign-off Nov 2020 | 924 Girard St | to comply with nov #201806891 fire damage being built exactly how it was. the alteration will not affect the envelope or occupancy of this building. replacing front vinyl windows with aluminium wood clad two windows facing street. remodel bathroom, electric water heater. replace 600 square feet sheeDetails
to comply with nov #201806891 fire damage being built exactly how it was. the alteration will not affect the envelope or occupancy of this building. replacing front vinyl windows with aluminium wood clad two windows facing street. remodel bathroom, electric water heater. replace 600 square feet shee | $12,600 |
| Mar 14, 2016 | Completed final sign-off Sep 2016 | 1623 Powell St | fire damaged;two kit. remodel: replace cabs., counter tops and sinks, like for like. three baths remodel: replace ceramic tiles and fixtures(2 in lower unit and 1 in upper unit): replace 2000 sq ft smoke damaged sheetrock, interior damaged casing, baseboards, finish floors at both units.Details
fire damaged;two kit. remodel: replace cabs., counter tops and sinks, like for like. three baths remodel: replace ceramic tiles and fixtures(2 in lower unit and 1 in upper unit): replace 2000 sq ft smoke damaged sheetrock, interior damaged casing, baseboards, finish floors at both units. | $75,000 |
| Feb 8, 2016 | Completed final sign-off Apr 2017 | 764 Union St | add 1/2 bathroom to 3rd flr; include toilet and sink. install new 90% eff. furnace. install new stackable w/d - incld - waiter lines & stand pip, install gas lines for furnace. install 1 pocket door for new half bath, power new forced air furnace and new w/d from (e) panelDetails
add 1/2 bathroom to 3rd flr; include toilet and sink. install new 90% eff. furnace. install new stackable w/d - incld - waiter lines & stand pip, install gas lines for furnace. install 1 pocket door for new half bath, power new forced air furnace and new w/d from (e) panel | $35,000 |
| Feb 1, 2016 | Completed final sign-off Apr 2017 | 764 Union St | replace (3) existing bathroom fixtures, toilet, sink and tub/shower.Details
replace (3) existing bathroom fixtures, toilet, sink and tub/shower. | $15,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2017 | 531 Miramar Av | adding a bathroom on ground floor off master bedroom and changing the shower size in second bathroom, changing window size in one bathroom.Details
adding a bathroom on ground floor off master bedroom and changing the shower size in second bathroom, changing window size in one bathroom. | $10,000 |
| Sep 11, 2015 | Completed final sign-off Jul 2016 | 351 Athens St | repair 50 sq. ft of roof sheathing(cut by fire dept.), replace kitchen cabinets per exisitng layout, repair interior drywall, 400 sq ft., repair existing rear stairs-thread, remodel bathroom.Details
repair 50 sq. ft of roof sheathing(cut by fire dept.), replace kitchen cabinets per exisitng layout, repair interior drywall, 400 sq ft., repair existing rear stairs-thread, remodel bathroom. | $50,000 |
| Apr 13, 2015 | Completed final sign-off Aug 2015 | 2131 40th Av | 1. repair smaoke-damaged drywall - 4-feet high at top floor and complete garage. 2. replace garage door and opener; replace kitchen cabinets and countertop per 3. existing layout. 4. replace 3 fixtures in the bathroom (tub, toilet and sink). 5. replace furnace.Details
1. repair smaoke-damaged drywall - 4-feet high at top floor and complete garage. 2. replace garage door and opener; replace kitchen cabinets and countertop per 3. existing layout. 4. replace 3 fixtures in the bathroom (tub, toilet and sink). 5. replace furnace. | $75,000 |
| Aug 1, 2012 | Expired or cancelled expired Aug 2025 | 1719 Lyon St | revision to app#201206203027 as part of bathroom remodeling, rewire basement room to code.Details
revision to app#201206203027 as part of bathroom remodeling, rewire basement room to code. | $8,000 |
| Aug 1, 2012 | Completed final sign-off Sep 2013 | 1719 Lyon St | revision to permit #201202224607. 2 1/2 bathrooms remodeling including toilets and sinks at both units. rewire all rooms at top unit 1721. main baths to include tubs and shower. revision to permit #201207114562. kitchen remodeling for both units to include replacement of gas line at unit 1719 toDetails
revision to permit #201202224607. 2 1/2 bathrooms remodeling including toilets and sinks at both units. rewire all rooms at top unit 1721. main baths to include tubs and shower. revision to permit #201207114562. kitchen remodeling for both units to include replacement of gas line at unit 1719 to | $18,000 |
| Jun 20, 2012 | Expired or cancelled expired Aug 2025 | 1719 Lyon St | replace 3 fixtures in basement bath, including: shower, sink and toilet and new floor tiel.Details
replace 3 fixtures in basement bath, including: shower, sink and toilet and new floor tiel. | $8,500 |
| Nov 9, 2011 | Completed final sign-off Dec 2011 | 3942 Washington St | bathroom remodel- replace tub, tile backsplash, install anti-scold shower faucet including repairs of surrounding water damaged walls. bathroom on 2/f middle of building.Details
bathroom remodel- replace tub, tile backsplash, install anti-scold shower faucet including repairs of surrounding water damaged walls. bathroom on 2/f middle of building. | $9,100 |
| Oct 20, 2011 | Expired or cancelled cancelled Oct 2011 | 50 Miramar Av | remodel bathroom - replace tub, sink, toilet, shower valve, light fixtures.Details
remodel bathroom - replace tub, sink, toilet, shower valve, light fixtures. | $1,200 |
| Oct 18, 2011 | Completed final sign-off Dec 2011 | 50 Miramar Av | replace (5) existing windows in kind same size from single pane aluminum(rear) to new double pane vinyl. replace wet sheetrock under 2 windows (from water damage); replace insulation (back-less). replace 3 bathroom fixtures in the same location (bath) and install tile back splash (@ 1 bathroom)Details
replace (5) existing windows in kind same size from single pane aluminum(rear) to new double pane vinyl. replace wet sheetrock under 2 windows (from water damage); replace insulation (back-less). replace 3 bathroom fixtures in the same location (bath) and install tile back splash (@ 1 bathroom) | $6,800 |
| Nov 3, 2009 | Completed final sign-off Apr 2011 | 250 Grattan St | no change to existing layout, bath remodel 1st fl up to code plumbing, reinstall plumbing fixtures, replace existing exhaust fan, add switch for fan and motion sensor, install 2 can lights, sheetrock walls, tile tub surround, replace in kind.Details
no change to existing layout, bath remodel 1st fl up to code plumbing, reinstall plumbing fixtures, replace existing exhaust fan, add switch for fan and motion sensor, install 2 can lights, sheetrock walls, tile tub surround, replace in kind. | $10,000 |
| Nov 2, 2009 | Completed final sign-off Dec 2009 | 58 Vicksburg St | bath and kitchen remodel - replace cabinets and countertops, bring to code electrical, replace shower pan, cement board for tileDetails
bath and kitchen remodel - replace cabinets and countertops, bring to code electrical, replace shower pan, cement board for tile | $15,000 |
| Jun 29, 2009 | Completed final sign-off Sep 2009 | 1426 29th Av | demo (e) bathroom (tile, shower, etc.) replace shower pan, drywall, plumbing fixtures, re-tile. replace light with florence fixture one bath room only.Details
demo (e) bathroom (tile, shower, etc.) replace shower pan, drywall, plumbing fixtures, re-tile. replace light with florence fixture one bath room only. | $11,000 |
| Jan 29, 2008 | Completed final sign-off May 2008 | 661 Laguna Honda Bl | replace/repair kitchen cabinets, same layout as (e), replace bath fixtures, shower, sink & water closet (one bath remodel), rewire bath & kitchen.Details
replace/repair kitchen cabinets, same layout as (e), replace bath fixtures, shower, sink & water closet (one bath remodel), rewire bath & kitchen. | $19,000 |
| Oct 12, 2007 | Expired or cancelled expired Aug 2008 | 40 Verna St | install new 1 bathroom cabinet, install new drywall, ceramic tile, replace toilet, sink, shower pan & shower valve. install 1 gfi plug, exhaust fan, 1 light fixture.Details
install new 1 bathroom cabinet, install new drywall, ceramic tile, replace toilet, sink, shower pan & shower valve. install 1 gfi plug, exhaust fan, 1 light fixture. | $7,000 |
| Sep 10, 2002 | Expired or cancelled expired May 2007 | 141 Prospect Av | new outlet & switch bathroom.Details
new outlet & switch bathroom. | $300 |
| Jul 22, 2002 | Expired or cancelled expired May 2007 | 141 Prospect Av | remodel bathroom, new fixtures & vanity, tub on 2nd floor.Details
remodel bathroom, new fixtures & vanity, tub on 2nd floor. | $4,739 |
| Jul 19, 2001 | Expired or cancelled expired Nov 2001 | 308 Columbus Av | rev. to appl#200105048443, replace (e) bathroom area w/1-bar ceiling with sameDetails
rev. to appl#200105048443, replace (e) bathroom area w/1-bar ceiling with same | $1,500 |
| Jan 31, 2000 | Completed final sign-off Jun 2001 | 1385 Carroll Av | one-stop, construct 2 floors of office space,2 stairwwlls,2 baths,new recessed entry doorway,2 doorsDetails
one-stop, construct 2 floors of office space,2 stairwwlls,2 baths,new recessed entry doorway,2 doors | $270,000 |