Back to bathroom remodel contractors
Mone Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2020 to Jan 2026
- Last 24 months
- 6 permits filed
21 permits since 2000: 12 completed, 7 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 in progress, 2 never finaled. Typically 14 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | In progress issued Jan 2026 | 140 Junipero Serra Bl | install of 10 new windows to match existing (marvin) on 2nd floor visible from the street. remodel main and master bath, fixture location to remain sameDetails
install of 10 new windows to match existing (marvin) on 2nd floor visible from the street. remodel main and master bath, fixture location to remain same | $145,000 |
| Nov 21, 2025 | In progress issued Dec 2025 | 150 San Buenaventura Wy | (n) skylight and interior non structural bedroom/bathroom renovations. facing street.Details
(n) skylight and interior non structural bedroom/bathroom renovations. facing street. | $85,000 |
| Sep 9, 2025 | In progress issued Sep 2025 | 35 Santa Clara Av | 3 bathroom remodels with new shower pans. to include plumbing fixtures, new lights, tiles and drywall. no location moving, like for like replacement.Details
3 bathroom remodels with new shower pans. to include plumbing fixtures, new lights, tiles and drywall. no location moving, like for like replacement. | $85,000 |
| Dec 4, 2023 | In progress issued Aug 2024 | 150 San Buenaventura Wy | proposed basement addition to include new bedroom,media room,exercise/work room,2 baths and storage rooms.Details
proposed basement addition to include new bedroom,media room,exercise/work room,2 baths and storage rooms. | $480,000 |
| Nov 8, 2022 | Never finaled issued Nov 2022, no final | 220 San Fernando Wy | add study room and half bath on first floor of single family home.Details
add study room and half bath on first floor of single family home. | $55,000 |
| Jan 8, 2021 | Never finaled issued Feb 2021, no final | 150 San Buenaventura Wy | bathroom remodel. same area.Details
bathroom remodel. same area. | $20,000 |