Back to bathroom remodel contractors
Monarch Builders Inc
- Based in
- Foster City
- On San Francisco permits
- Sep 2016 to May 2018
- Last 24 months
- 0 permits filed
24 permits since 2000: 14 completed, 8 never finaled, 2 expired or cancelled.
Of the 8 never-finaled permits, 7 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 3 never finaled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 29, 2018 | Completed final sign-off Oct 2018 | 1507 Cole St | complete kitchen and bathroom remodel. same location. no moving walls or doors. (5) new vinyl windows in back, (10) new recessed lights in living room and kitchenDetails
complete kitchen and bathroom remodel. same location. no moving walls or doors. (5) new vinyl windows in back, (10) new recessed lights in living room and kitchen | $20,000 |
| Jan 17, 2018 | Never finaled issued Jan 2018, no final | 925 Corbett Av | unit 302: kitchen remodeling the same. bathroom remodeling the same. upgrade panel box in same location.Details
unit 302: kitchen remodeling the same. bathroom remodeling the same. upgrade panel box in same location. | $20,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 414 Waller St | update kithen with new counters and countertops, new sink, stove, wood flooring like for like., update bathroom with new new tile, vanity, exhaust fan, ligfhts sink and flooring likeDetails
update kithen with new counters and countertops, new sink, stove, wood flooring like for like., update bathroom with new new tile, vanity, exhaust fan, ligfhts sink and flooring like | $20,000 |
| Aug 8, 2017 | Completed final sign-off Oct 2017 | 1447 21st Av | two bathroom remodel in same location, no moving of doors, walls or windowsDetails
two bathroom remodel in same location, no moving of doors, walls or windows | $20,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2020 | 738 06th Av | #2 - remodel kitchen & bathroomDetails
#2 - remodel kitchen & bathroom | $40,000 |
| Jun 8, 2017 | Completed final sign-off Sep 2018 | 945 Corbett Av | 2 bathroom remodeling no moving of walls, doors or windows, everything in the same locationDetails
2 bathroom remodeling no moving of walls, doors or windows, everything in the same location | $27,000 |
| May 3, 2017 | Completed final sign-off Jun 2017 | 405 Valencia St | to comply with nov#201756382. bathroom remodel. n/a for maher.Details
to comply with nov#201756382. bathroom remodel. n/a for maher. | $6,000 |
| Apr 25, 2017 | Never finaled issued Apr 2017, no final | 2412 Harrison St | #108 -bathroom remodel; ;tub to shower & tile & shower head.Details
#108 -bathroom remodel; ;tub to shower & tile & shower head. | $10,000 |
| Feb 27, 2017 | Completed final sign-off Jun 2017 | 726 Clayton St | remodel bathroom, half bath remodel & add sink. no wall to be removed.Details
remodel bathroom, half bath remodel & add sink. no wall to be removed. | $20,000 |
| Jan 24, 2017 | Completed final sign-off Apr 2017 | 925 Corbett Av | kitchen and bathroom remodel. new panel box and new water tankless water heater. l.e.d. recessed lightsDetails
kitchen and bathroom remodel. new panel box and new water tankless water heater. l.e.d. recessed lights | $10,000 |
| Oct 26, 2016 | Completed final sign-off Feb 2022 | 3531 19th St | (e) 1/2 bath expanding to fullDetails
(e) 1/2 bath expanding to full | $10,000 |
| Oct 26, 2016 | Never finaled issued Oct 2016, no final | 2155 Buchanan St | unit #7: remodel exist'g bathroom and install new subpanel 200 amp. all new bathroom fixtures to be remained at same location. no new wall & no exist'g wall relocation. new lighting shall comply with cec 150.0 (k)5. all sheetrock if needed to be replaced shall be 5/8" type x gyp. boardDetails
unit #7: remodel exist'g bathroom and install new subpanel 200 amp. all new bathroom fixtures to be remained at same location. no new wall & no exist'g wall relocation. new lighting shall comply with cec 150.0 (k)5. all sheetrock if needed to be replaced shall be 5/8" type x gyp. board | $10,000 |