Momentum Construction Inc
- Based in
- Sherman Oaks
- On San Francisco permits
- Nov 2018 to Jul 2026
- Last 24 months
- 9 permits filed
30 permits since 2000: 23 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2026 | In progress issued Jul 2026 | 2161 20th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $30,000 |
| Jun 17, 2026 | In progress issued Jun 2026 | 1 Rausch St | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $30,000 |
| Jun 11, 2026 | In progress issued Sep 2026 | 1 Rausch St | unit f: expand 38 sf into building corridor. remodel / enlargement of bathroom.Details
unit f: expand 38 sf into building corridor. remodel / enlargement of bathroom. | $40,000 |
| Mar 9, 2026 | In progress issued May 2026 | 535 Hill St | kitchen remodel like to like. convert hallway closet to half bath with laundry. all work on second floorDetails
kitchen remodel like to like. convert hallway closet to half bath with laundry. all work on second floor | $60,000 |
| Mar 5, 2026 | In progress issued Apr 2026 | 167 Judson Av | remodel kitchen and bath. replace roof ove porch in lightwell. no exterior work visible fdrom street, no expansion of building envelope.Details
remodel kitchen and bath. replace roof ove porch in lightwell. no exterior work visible fdrom street, no expansion of building envelope. | $80,000 |
| Jan 7, 2026 | Completed final sign-off May 2026 | 164 Diamond St | 2 bathroom remodels like for like. no removal of wallsDetails
2 bathroom remodels like for like. no removal of walls | $80,000 |
| Nov 4, 2025 | In progress issued Nov 2025 | 60 Urbano Dr | unit 1: 4 bathrooms remodel in kind. master bathroom (approx 90sq ft.), 1st guest (approx 56 sq ft.), 2nd guest (approx 56 sq ft.) & 3rd guest (approx. 56 sq ft.) tub to shower installation for 3 bathrooms.Details
unit 1: 4 bathrooms remodel in kind. master bathroom (approx 90sq ft.), 1st guest (approx 56 sq ft.), 2nd guest (approx 56 sq ft.) & 3rd guest (approx. 56 sq ft.) tub to shower installation for 3 bathrooms. | $90,000 |
| Apr 15, 2025 | Completed final sign-off Jun 2025 | 1862 15th Av | redo exterior staircase tile like for like. waterproof and new tile. add electrical line for outside lighting and repalce (e) hose bib.Details
redo exterior staircase tile like for like. waterproof and new tile. add electrical line for outside lighting and repalce (e) hose bib. | $28,000 |
| Feb 11, 2025 | Completed final sign-off Jun 2025 | 1156 Treat Av | bathroom & half bathroom remodel replace all plumbing fixtures update e/m/p up to code replace lights, switches replace outlets. remodel like for like.Details
bathroom & half bathroom remodel replace all plumbing fixtures update e/m/p up to code replace lights, switches replace outlets. remodel like for like. | $44,000 |
| Aug 6, 2024 | Completed final sign-off Dec 2024 | 1341 Stanyan St | kitchen & bahtroom remodel, like for like.Details
kitchen & bahtroom remodel, like for like. | $40,000 |
| Aug 6, 2024 | Completed final sign-off Sep 2024 | 1341 Stanyan St | reroofing: tear off existing; add composition shingles roof, 15 sqft.Details
reroofing: tear off existing; add composition shingles roof, 15 sqft. | $5,000 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 762 12th Av | plywood roof repair. (ref pa# 202407106211)Details
plywood roof repair. (ref pa# 202407106211) | $6,000 |
| Jul 10, 2024 | Completed final sign-off Aug 2024 | 762 12th Av | reroofing (ref bpa# 202407106207)Details
reroofing (ref bpa# 202407106207) | $30,000 |
| May 30, 2024 | Completed final sign-off Jun 2024 | 1635 Lincoln Wy | kitchen remodel in kind no wall removal or structural work. replace faucet sink and paint.Details
kitchen remodel in kind no wall removal or structural work. replace faucet sink and paint. | $14,000 |
| Apr 29, 2024 | Completed final sign-off Jul 2024 | 762 12th Av | repair wood stairs, landing, guardrails, and post in kind located at the right side of property due to dry rot damage. no change to footprint and exterior work only. like for like replacement.Details
repair wood stairs, landing, guardrails, and post in kind located at the right side of property due to dry rot damage. no change to footprint and exterior work only. like for like replacement. | $68,000 |
| Feb 13, 2024 | Completed final sign-off Apr 2024 | 2426 35th Av | replace 2 windows like to like in the back of the house. same size same location as existing. u=0.3maxDetails
replace 2 windows like to like in the back of the house. same size same location as existing. u=0.3max | $1,500 |
| Feb 13, 2024 | Completed final sign-off Sep 2024 | 395 Teddy Av | one bathroom remodel like for like. 1,000 sf wood siding replacement at rear x3 wall.Details
one bathroom remodel like for like. 1,000 sf wood siding replacement at rear x3 wall. | $40,000 |
| Feb 9, 2024 | Completed final sign-off Jul 2024 | 1779 32nd Av | demo of interior wall and knee braces. build new bathroom and storage room with laundry inside the extg garage space.Details
demo of interior wall and knee braces. build new bathroom and storage room with laundry inside the extg garage space. | $30,000 |
| Jan 16, 2024 | Completed final sign-off Apr 2024 | 60 Urbano Dr | one kitchen remodeling like for likeDetails
one kitchen remodeling like for like | $35,000 |
| Dec 19, 2023 | Completed final sign-off Jun 2024 | 1779 32nd Av | one kitchen like for like. non structuralDetails
one kitchen like for like. non structural | $45,000 |
| Dec 19, 2023 | Completed final sign-off Apr 2024 | 2426 35th Av | one kitchen like for like. non structural.Details
one kitchen like for like. non structural. | $80,000 |
| Oct 24, 2023 | Completed final sign-off Feb 2024 | 2161 20th Av | removal of non-load bearing walls. demolition of interior wallsDetails
removal of non-load bearing walls. demolition of interior walls | $15,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2024 | 2161 20th Av | replace kitchen sink, replace dishwasher - no removal of wallsDetails
replace kitchen sink, replace dishwasher - no removal of walls | $20,000 |
| Oct 11, 2023 | In progress issued Oct 2023 | 2127 12th Av | one bathroom remodel like to like with a shower.Details
one bathroom remodel like to like with a shower. | $14,000 |
| Sep 22, 2023 | Completed final sign-off Feb 2024 | 3991 20th St | (e) laundry remodel. new bathroom at basement (e) storage. isolate bathroom exhaust fan.Details
(e) laundry remodel. new bathroom at basement (e) storage. isolate bathroom exhaust fan. | $123,000 |
| Aug 18, 2023 | Completed final sign-off Feb 2024 | 3991 20th St | remodel one bathroom on the 3rd story. in-kindDetails
remodel one bathroom on the 3rd story. in-kind | $20,000 |
| Jul 25, 2023 | Completed final sign-off Nov 2023 | 1 Daniel Burnham Ct | unit 1112: bathroom remodeling: electrical 3 led lights, 1 gfci outlet, 2 lights switches, exhaust fan, 2 dedicated elecctrical lines, plumbing: upgrade existing plumbing to copper , new faucet, shower drain, toilet, building: demo existing shower install tub and shower combo walk in tub.Details
unit 1112: bathroom remodeling: electrical 3 led lights, 1 gfci outlet, 2 lights switches, exhaust fan, 2 dedicated elecctrical lines, plumbing: upgrade existing plumbing to copper , new faucet, shower drain, toilet, building: demo existing shower install tub and shower combo walk in tub. | $30,000 |
| Jun 7, 2023 | Completed final sign-off Jul 2023 | 2532 Kirkham St | remove wood siding and install new stucco front of house approx. 200 sf.Details
remove wood siding and install new stucco front of house approx. 200 sf. | $10,000 |
| May 23, 2023 | Completed final sign-off Aug 2023 | 55 Ora Wy | unit 106b: bathroom remodel like for like. replace plumbing fixtures: toilet, sink, valve, tile, shower. replace fan.Details
unit 106b: bathroom remodel like for like. replace plumbing fixtures: toilet, sink, valve, tile, shower. replace fan. | $10,000 |
| Nov 8, 2018 | Completed final sign-off May 2019 | 50 Estero Av | replace total 21 windows with aluminum-clad wood frame fixed and 4 are casement sashes; 5 front bay windows will had sdl grids to match existing configuration.Details
replace total 21 windows with aluminum-clad wood frame fixed and 4 are casement sashes; 5 front bay windows will had sdl grids to match existing configuration. | $30,000 |