Back to bathroom remodel contractors
Molina And Associates Inc Dba Molari Con
- Based in
- Millbrae
- On San Francisco permits
- Feb 2012 to Aug 2020
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 6 days from filing to permit and 271 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2017 | Completed final sign-off Apr 2020 | 752 24th Av | horizontal extension. building rear extension on 1st, 2nd, 3rd flr. add bedrooms @ 1st & 3rd flr. (n) guest bath @ 2nd floor. (n) bathroom @ 3rd & 1st floor.Details
horizontal extension. building rear extension on 1st, 2nd, 3rd flr. add bedrooms @ 1st & 3rd flr. (n) guest bath @ 2nd floor. (n) bathroom @ 3rd & 1st floor. | $200,000 |
| Jul 30, 2015 | Completed final sign-off May 2016 | 940 Jackson St | #1- rev. to pa 201403312017; adding basement to unit 1, reconfigure kitchen & baths to accomodate (e) structural members,demo (e)floor & ceiling finishes in basement & replace with new,revise stairs in basement to accommodate (n) flr levels,remove bedrm 2 closet on g/f. sprinklers sep. permit.Details
#1- rev. to pa 201403312017; adding basement to unit 1, reconfigure kitchen & baths to accomodate (e) structural members,demo (e)floor & ceiling finishes in basement & replace with new,revise stairs in basement to accommodate (n) flr levels,remove bedrm 2 closet on g/f. sprinklers sep. permit. | |
| Jun 9, 2015 | Completed final sign-off Sep 2015 | 227 Precita Av | remodel kitchen & bathroom. replace kitchen & bathroom. replace cabinets, sinks, tubs, flooring. no alteration at wall, window & door.Details
remodel kitchen & bathroom. replace kitchen & bathroom. replace cabinets, sinks, tubs, flooring. no alteration at wall, window & door. | $10,000 |
| Mar 31, 2014 | Completed final sign-off May 2016 | 940 Jackson St | combine unit #1 with portion of lower level unit (basement), reconfigure unit from 1 bed, 1 bath to 2 bed, 2 baths, 1 media room. replace 4 exterior windows at rear of building.Details
combine unit #1 with portion of lower level unit (basement), reconfigure unit from 1 bed, 1 bath to 2 bed, 2 baths, 1 media room. replace 4 exterior windows at rear of building. | $79,590 |
| Mar 8, 2012 | Completed final sign-off May 2012 | 193 Henry St | remodel kitchen & 1 bathroom on 1/f. no walls moved, lighting to comply with cec150kDetails
remodel kitchen & 1 bathroom on 1/f. no walls moved, lighting to comply with cec150k | $18,000 |