Back to bathroom remodel contractors
Modulus Company
- Based in
- San Francisco
- On San Francisco permits
- Jun 2010 to Jun 2025
- Last 24 months
- 1 permit filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 126 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2025 | Completed final sign-off Oct 2025 | 309 Steiner St | unit d: back of the property (rear building). remodel kitchen in kind. add new fixtures, add 6 can lights. remodel 2nd floor bathroom, new fixtures, 2 can lights, (e) locations.Details
unit d: back of the property (rear building). remodel kitchen in kind. add new fixtures, add 6 can lights. remodel 2nd floor bathroom, new fixtures, 2 can lights, (e) locations. | $40,000 |
| Jun 1, 2017 | Completed final sign-off Oct 2017 | 965 Elizabeth St | 1st floor - legalize (e) bathroom and create bedroom, upgrades will consist of upgrade bathroom and electricalDetails
1st floor - legalize (e) bathroom and create bedroom, upgrades will consist of upgrade bathroom and electrical | $25,000 |
| Jul 6, 2011 | Completed final sign-off Nov 2011 | 1635 Castro St | remodel 2nd. floor bath, change shower to tub. not moving or adding any walls, all work on the main level.Details
remodel 2nd. floor bath, change shower to tub. not moving or adding any walls, all work on the main level. | $15,000 |
| Jun 21, 2010 | Completed final sign-off Nov 2010 | 1635 Castro St | remodel existing bath, change tub to shower , add lightsDetails
remodel existing bath, change tub to shower , add lights | $15,000 |