Back to bathroom remodel contractors
Modern Green Constructions Inc
- Based in
- San Leandro
- On San Francisco permits
- Jun 2021 to Dec 2025
- Last 24 months
- 6 permits filed
18 permits since 2000: 13 completed, 2 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 1 in progress, 1 never finaled. Typically 1 days from filing to permit and 253 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 25, 2025 | In progress issued Jun 2025 | 45 Anzavista Av | rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street.Details
rewire for entir house, 7 skylights replacements in kind, 2 complete bathrooms remodel. no walls or layout changes. one shower pan. nothing is visible from the street. | $30,000 |
| Feb 29, 2024 | Completed final sign-off Jul 2024 | 128 Kirkham St | 1 new bathroom & closet on upper lvlDetails
1 new bathroom & closet on upper lvl | $40,000 |
| Sep 28, 2023 | Completed final sign-off Feb 2024 | 528 Ortega St | complete guest bathroom. remodel like for like. replacing tub and shower like for like. 1 tub and 1 shower. no walls removal.Details
complete guest bathroom. remodel like for like. replacing tub and shower like for like. 1 tub and 1 shower. no walls removal. | $15,000 |
| May 11, 2023 | Completed final sign-off Feb 2025 | 1727 43rd Av | conversion of the lower level bedroom into a family room. conversion of the (e) garage space into habitable space for relcation of (e) lower level bedroom and new bathroom.Details
conversion of the lower level bedroom into a family room. conversion of the (e) garage space into habitable space for relcation of (e) lower level bedroom and new bathroom. | $90,000 |
| May 11, 2023 | Never finaled issued May 2023, no final | 759 07th Av | complete 1 bathroom remodel, like for like (tub/shower). rewire the entire unit, install subpanel, repipe kitchen and bathroom.Details
complete 1 bathroom remodel, like for like (tub/shower). rewire the entire unit, install subpanel, repipe kitchen and bathroom. | $30,000 |
| Jan 10, 2023 | Completed final sign-off Jan 2025 | 1727 43rd Av | renovation and reconfiguration of kitchen, one bath and closet. remove existing bearing wall between kitchen and living room; voluntary adding plywood shearwall at lower level w/ holdown on existing footing; no foundation workDetails
renovation and reconfiguration of kitchen, one bath and closet. remove existing bearing wall between kitchen and living room; voluntary adding plywood shearwall at lower level w/ holdown on existing footing; no foundation work | $50,000 |
| Sep 21, 2021 | Completed final sign-off Feb 2025 | 1210 40th Av | convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl.Details
convert existing livable space into adu 500 sf, add new interior stairs, add new skylight in bathroom. add power and office to main on ground 1st fl. add new stairs between garage and main unit at 2nd fl. | $35,000 |
| Aug 9, 2021 | Completed final sign-off Feb 2022 | 757 07th Av | rewire electrical to code including service panels, outlets, and switches for safety. (e) knobb and tube is eroded. kitchen and bathroom to be demolished to replace plumbing that has detoriorated. kitchen and bathrooms to be like for like subsequent repairs to insulation, drywall, windows and sidingDetails
rewire electrical to code including service panels, outlets, and switches for safety. (e) knobb and tube is eroded. kitchen and bathroom to be demolished to replace plumbing that has detoriorated. kitchen and bathrooms to be like for like subsequent repairs to insulation, drywall, windows and siding | $35,000 |
| Jun 9, 2021 | Completed final sign-off Feb 2022 | 72 Lippard Av | g/f: remodel (1) existing bathroom.partial reframe of 9e) wall, demo cabinet and countertop.remodel to bve like for like using drainage lines.remove/replace toilet plumbing fixtures elctrical receptacles,tile and picture window (wall is non-load bearing).Details
g/f: remodel (1) existing bathroom.partial reframe of 9e) wall, demo cabinet and countertop.remodel to bve like for like using drainage lines.remove/replace toilet plumbing fixtures elctrical receptacles,tile and picture window (wall is non-load bearing). | $12,999 |