Modern Craft Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 60 completed, 3 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
14 stairs permits: 12 completed, 1 in progress, 1 never finaled. Typically 42 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 7, 2025 | In progress issued Jul 2025 | 16 Sloat Bl | expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimneyDetails
expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimney | $240,000 |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 339 College Av | partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code.Details
partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code. | $250,000 |
| Jan 31, 2024 | Completed final sign-off Dec 2024 | 50 Cerritos Av | revision to pa# 202101303692: relocate basement egress to exterior stairway. reframe access stairway from first floor to basement; not a required means of egress.Details
revision to pa# 202101303692: relocate basement egress to exterior stairway. reframe access stairway from first floor to basement; not a required means of egress. | |
| May 26, 2023 | Never finaled issued Jul 2023, no final | 3697 25th St | revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22"Details
revision to pa 2021-0412-8307 (n) wood stairs < 30 above (e) grade; (n) retaining wall below (e) grade; (n) window wells below grade; (e) stairs to basement to be removed excavate part of rear yard 22" | $10,000 |
| Apr 21, 2021 | Completed final sign-off Jun 2023 | 1731 Palou Av | to comply with nov 202069311. construct deck and stairs at rear building. deck and stair to be repaired in kind. new retainging wall at back side of deck.Details
to comply with nov 202069311. construct deck and stairs at rear building. deck and stair to be repaired in kind. new retainging wall at back side of deck. | $5,000 |
| Jan 30, 2021 | Completed final sign-off Dec 2024 | 50 Cerritos Av | basement: excavation & expansion of habitable space; 1st fl: interior cosmetic improvements; 2nd fl: rear addition, interior reconfig; limited window replacement/reconfig related to interiors scope; repairs to front entry stairway replacement of basement stairway @ side yard; mep under sep permitDetails
basement: excavation & expansion of habitable space; 1st fl: interior cosmetic improvements; 2nd fl: rear addition, interior reconfig; limited window replacement/reconfig related to interiors scope; repairs to front entry stairway replacement of basement stairway @ side yard; mep under sep permit | $300,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2021 | 615 Hayes St | kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yardDetails
kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yard | $300,000 |
| Oct 24, 2017 | Completed final sign-off Sep 2018 | 60 Seacliff Av | (n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher naDetails
(n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher na | $115,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2018 | 350 Teresita Bl | changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylightsDetails
changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylights | $65,000 |
| Apr 24, 2017 | Completed final sign-off Mar 2018 | 75 Mercedes Wy | new bathroom, bedroom and stair gr fl. new windows and doors at rear yard. new window at side yard. new patio on grade lavel at rear yardDetails
new bathroom, bedroom and stair gr fl. new windows and doors at rear yard. new window at side yard. new patio on grade lavel at rear yard | $250,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 460 Melrose Av | remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard.Details
remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard. | $45,000 |
| Nov 18, 2015 | Completed final sign-off Jul 2016 | 32 Walter St | revision to pa#201408083362: add stair details. (interior)Details
revision to pa#201408083362: add stair details. (interior) | $30,000 |
| Jun 8, 2015 | Completed final sign-off Mar 2017 | 57 Walter St | replace (e) four story rear yard stair serving 3 residential units, structural upgrades at laundry porch, provide foundation, shearwalls, floor & wall reinforcing, new windows & doors, repair or replace siding as needed.Details
replace (e) four story rear yard stair serving 3 residential units, structural upgrades at laundry porch, provide foundation, shearwalls, floor & wall reinforcing, new windows & doors, repair or replace siding as needed. | $52,000 |
| Aug 8, 2014 | Completed final sign-off Jul 2016 | 32 Walter St | remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garageDetails
remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garage | $200,000 |