Back to kitchen remodel contractors
Modern Craft Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 60 completed, 3 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 23 completed, 1 in progress, 1 never finaled. Typically 7 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 28, 2026 | Completed final sign-off Oct 2026 | 118 15th Av | new fire rated stairwell additon between units, 120 15th ave new opening to create studio apartment ( no enclosed sleeping room) 118 15th ave new opening between kitchen and dining rm. new full height non structural partiton to creat walk in pantryDetails
new fire rated stairwell additon between units, 120 15th ave new opening to create studio apartment ( no enclosed sleeping room) 118 15th ave new opening between kitchen and dining rm. new full height non structural partiton to creat walk in pantry | $50,000 |
| May 7, 2025 | In progress issued Jul 2025 | 16 Sloat Bl | expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimneyDetails
expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimney | $240,000 |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 339 College Av | partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code.Details
partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code. | $250,000 |
| May 4, 2021 | Completed final sign-off Sep 2021 | 29 Dorland St | in kind remodel/refresh. interior only of kitchen, 3 baths & powder room. no new plumbing fixtures. kitchen; reface cabinets/drawers, (n) cabinet, (e) appliances to remain bathroom; in kind remodel of cabinets, counters sink toilets.Details
in kind remodel/refresh. interior only of kitchen, 3 baths & powder room. no new plumbing fixtures. kitchen; reface cabinets/drawers, (n) cabinet, (e) appliances to remain bathroom; in kind remodel of cabinets, counters sink toilets. | $30,000 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2021 | 615 Hayes St | kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yardDetails
kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yard | $300,000 |
| Jan 30, 2020 | Completed final sign-off Dec 2020 | 332 Magellan Av | kitchen remodelDetails
kitchen remodel | $60,000 |
| Oct 7, 2019 | Completed final sign-off Jun 2026 | 850 Wisconsin St | interior remodel of extg kitchen with shearwall modification.Details
interior remodel of extg kitchen with shearwall modification. | $55,000 |
| Oct 4, 2019 | Completed final sign-off Aug 2020 | 414 Bosworth St | unit b: remodel of existing kitchen, remodel of (e) powder room, new back door. repair in kind, same size, same location.Details
unit b: remodel of existing kitchen, remodel of (e) powder room, new back door. repair in kind, same size, same location. | $65,000 |
| Aug 27, 2019 | Completed final sign-off Jan 2022 | 58 Bridgeview Dr | reno & reconfig of kitchen, liv & din & (e) bath. add 2nd bath * 1/2 bath @ 2nd flr. create new mastersuite w/bath @1st flr, expand conditioned space to basement for new family rm & bath, replace (e) deck at rear 2nd flr. new window & door opening at rearDetails
reno & reconfig of kitchen, liv & din & (e) bath. add 2nd bath * 1/2 bath @ 2nd flr. create new mastersuite w/bath @1st flr, expand conditioned space to basement for new family rm & bath, replace (e) deck at rear 2nd flr. new window & door opening at rear | $175,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 654 15th Av | remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade.Details
remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade. | $75,000 |
| Jun 8, 2018 | Completed final sign-off Nov 2018 | 607 Teresita Bl | kitchen remodel and bathroom remodel on 2nd floor. new bathroom on 1st floor and living space on 1st floorDetails
kitchen remodel and bathroom remodel on 2nd floor. new bathroom on 1st floor and living space on 1st floor | $95,000 |
| May 18, 2018 | Completed final sign-off Jun 2019 | 89 Idora Av | interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows.Details
interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows. | $120,000 |
| Oct 24, 2017 | Completed final sign-off Sep 2018 | 60 Seacliff Av | (n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher naDetails
(n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher na | $115,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2018 | 350 Teresita Bl | changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylightsDetails
changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylights | $65,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 626 Baker St | rear building: renovate existing kitchen, reonvate e bath, reinforce e foundation and wood frame, reconfigure e non load bearing partitions, replace existing composite roof shingles. size to match existing shingles. new french doors at front facade.Details
rear building: renovate existing kitchen, reonvate e bath, reinforce e foundation and wood frame, reconfigure e non load bearing partitions, replace existing composite roof shingles. size to match existing shingles. new french doors at front facade. | $75,000 |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 278 Randall St | 2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k).Details
2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k). | $60,000 |
| Aug 30, 2016 | Completed final sign-off Feb 2017 | 171 Sussex St | remodel of existing kitchen & living room. no walls added or removed.Details
remodel of existing kitchen & living room. no walls added or removed. | $45,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 460 Melrose Av | remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard.Details
remodel of (e)kitchen,including new french doors & skylight. approx 2' tall walkway addition at existing rear yard concrete walkway adjacent to house.notch in (e)rear yard walkway retaining wall for new stair to yard. | $45,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2016 | 1441 14th Av | interior remodel of extg kitchen with enlarged wall opening to dining room, greenhouse window of extg north kitchen window opening, and new kitchen skylight.Details
interior remodel of extg kitchen with enlarged wall opening to dining room, greenhouse window of extg north kitchen window opening, and new kitchen skylight. | $38,000 |
| Oct 30, 2015 | Completed final sign-off Jun 2016 | 182 Fairmount St | kitchen remodel with minor structural work. new skylightDetails
kitchen remodel with minor structural work. new skylight | $25,000 |
| Mar 31, 2015 | Completed final sign-off Jul 2016 | 32 Walter St | work is to comply w/nov 201469491 - selective demolition work after fire - kitchen & baths.Details
work is to comply w/nov 201469491 - selective demolition work after fire - kitchen & baths. | $1,000 |
| Oct 14, 2014 | Completed final sign-off Jun 2015 | 1032 Junipero Serra Bl | remodel (e) kitchen, add one new bathroom, new family roon on ground floor. remodel (e) bathroom on second floor. construct a new deck at rear (stratford dr. side). relace (e) furnace and water heater.Details
remodel (e) kitchen, add one new bathroom, new family roon on ground floor. remodel (e) bathroom on second floor. construct a new deck at rear (stratford dr. side). relace (e) furnace and water heater. | $40,000 |
| Aug 8, 2014 | Completed final sign-off Jul 2016 | 32 Walter St | remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garageDetails
remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garage | $200,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 4140 20th St | remodel existing first level kitchen and master bathDetails
remodel existing first level kitchen and master bath | $40,000 |