Back to bathroom remodel contractors
Modern Craft Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2013 to Jul 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 60 completed, 3 in progress, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 4 are 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
27 bathroom remodel permits: 24 completed, 2 in progress, 1 never finaled. Typically 31 days from filing to permit and 291 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2026 | In progress issued Jun 2026 | 100 Sloat Bl | remodel 2 bathrooms, 1 new window, 3 new skylights, relocate washer and dryer.Details
remodel 2 bathrooms, 1 new window, 3 new skylights, relocate washer and dryer. | $25,000 |
| May 7, 2025 | In progress issued Jul 2025 | 16 Sloat Bl | expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimneyDetails
expand living space into part of garage add new code compliant interior stair to conncet floors reconfigure bedrooms and kitchen as needed and bathrooms at both levels remove fireplace and cantilevered masonry chimney | $240,000 |
| Apr 17, 2025 | Completed final sign-off Dec 2025 | 339 College Av | partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code.Details
partial interior remodel with no change to building footprint. kitchen remodel with (n) skylight, window replacement, new stairwell to replace non-code compliant (e) one in-kind. partial mudroom and bath remodel. entry brick stairs to be repaired, front setback to be partially permeable per code. | $250,000 |
| Nov 12, 2021 | Completed final sign-off Sep 2022 | 278 Randall St | revision to approved permit# 201912200214. ground flr changes per plans. removal of new bath and associated excavation, ceiling height and foundation changes at approved horizontal addition.Details
revision to approved permit# 201912200214. ground flr changes per plans. removal of new bath and associated excavation, ceiling height and foundation changes at approved horizontal addition. | |
| May 4, 2021 | Completed final sign-off Sep 2021 | 29 Dorland St | in kind remodel/refresh. interior only of kitchen, 3 baths & powder room. no new plumbing fixtures. kitchen; reface cabinets/drawers, (n) cabinet, (e) appliances to remain bathroom; in kind remodel of cabinets, counters sink toilets.Details
in kind remodel/refresh. interior only of kitchen, 3 baths & powder room. no new plumbing fixtures. kitchen; reface cabinets/drawers, (n) cabinet, (e) appliances to remain bathroom; in kind remodel of cabinets, counters sink toilets. | $30,000 |
| Apr 12, 2021 | Never finaled issued Nov 2022, no final | 3697 25th St | adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish.Details
adu basement alterations. 1st floor prep kitchen. 2nd floor bedrooms & bath. remodel finish. | $115,000 |
| Mar 11, 2020 | Completed final sign-off Feb 2021 | 615 Hayes St | kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yardDetails
kitchen remodel and addition of powder room on 1st fl. bathroom remodel and addition of bathroom on 2nd fl. replacement of 1st fl. deck and stair down to the back yard | $300,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2022 | 278 Randall St | 1016 sf addition: 3 story vertical and horizontal addition @ property line. addition to include 2 new bathrooms, 1 new bedroom, and 1 new family room.Details
1016 sf addition: 3 story vertical and horizontal addition @ property line. addition to include 2 new bathrooms, 1 new bedroom, and 1 new family room. | $85,000 |
| Aug 27, 2019 | Completed final sign-off Jan 2022 | 58 Bridgeview Dr | reno & reconfig of kitchen, liv & din & (e) bath. add 2nd bath * 1/2 bath @ 2nd flr. create new mastersuite w/bath @1st flr, expand conditioned space to basement for new family rm & bath, replace (e) deck at rear 2nd flr. new window & door opening at rearDetails
reno & reconfig of kitchen, liv & din & (e) bath. add 2nd bath * 1/2 bath @ 2nd flr. create new mastersuite w/bath @1st flr, expand conditioned space to basement for new family rm & bath, replace (e) deck at rear 2nd flr. new window & door opening at rear | $175,000 |
| Jul 1, 2019 | Completed final sign-off Aug 2020 | 332 Magellan Av | bathroom remodel @ 2nd floor with elevated roof section and new skylight openings. work not visible from streetDetails
bathroom remodel @ 2nd floor with elevated roof section and new skylight openings. work not visible from street | $35,000 |
| Feb 13, 2019 | Completed final sign-off Feb 2020 | 654 15th Av | remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade.Details
remodel kitchen and bath at 2nd fl add powder rm. 2nd fl add 2nd full bath, remodel master bath. voluntary seismic upgrade. | $75,000 |
| Jan 18, 2019 | Completed final sign-off May 2019 | 850 Wisconsin St | move existing 4th fl bath to existing closet, turn bedroom window into transom window, new bedroom fireplaceDetails
move existing 4th fl bath to existing closet, turn bedroom window into transom window, new bedroom fireplace | $40,000 |
| Jun 8, 2018 | Completed final sign-off Nov 2018 | 607 Teresita Bl | kitchen remodel and bathroom remodel on 2nd floor. new bathroom on 1st floor and living space on 1st floorDetails
kitchen remodel and bathroom remodel on 2nd floor. new bathroom on 1st floor and living space on 1st floor | $95,000 |
| May 18, 2018 | Completed final sign-off Jun 2019 | 89 Idora Av | interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows.Details
interior remodel: kitchen & 2 baths, convert rear of garage to habitable space + 2 bath. excavate well for new rear door. replace selected windows. | $120,000 |
| Oct 24, 2017 | Completed final sign-off Sep 2018 | 60 Seacliff Av | (n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher naDetails
(n) interior stairs to all levels. 2nd fl: kitchen remodel, new full and half bath, renovate (e) bath. 3rd fl: remodel (e) full bath to 1/2 bath. (n) roof dormer & windows at west elevation. maher na | $115,000 |
| Oct 10, 2017 | Completed final sign-off Nov 2018 | 350 Teresita Bl | changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylightsDetails
changing storage into acclimated space including bedroom, full bath & 1/2 bath, study room and mudroom at 1st story; reconfigure interior stairs, relocated kitchen & bath & add (n) bath; new wood deck off rear yard, new windows & skylights | $65,000 |
| Jun 28, 2017 | Completed final sign-off Aug 2020 | 1506 07th Av | rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit.Details
rear yard addition. remodel interior. room down addition. no change to building use. (5) bedroom, 3 1/2 bath. note: shoring and geo grout under a separate permit. | $400,000 |
| Apr 24, 2017 | Completed final sign-off Mar 2018 | 75 Mercedes Wy | new bathroom, bedroom and stair gr fl. new windows and doors at rear yard. new window at side yard. new patio on grade lavel at rear yardDetails
new bathroom, bedroom and stair gr fl. new windows and doors at rear yard. new window at side yard. new patio on grade lavel at rear yard | $250,000 |
| Apr 12, 2017 | Completed final sign-off Apr 2018 | 626 Baker St | rear building: renovate existing kitchen, reonvate e bath, reinforce e foundation and wood frame, reconfigure e non load bearing partitions, replace existing composite roof shingles. size to match existing shingles. new french doors at front facade.Details
rear building: renovate existing kitchen, reonvate e bath, reinforce e foundation and wood frame, reconfigure e non load bearing partitions, replace existing composite roof shingles. size to match existing shingles. new french doors at front facade. | $75,000 |
| Mar 13, 2017 | Completed final sign-off Aug 2017 | 1506 07th Av | new master bathroom. no structural work. no change to building envelopeDetails
new master bathroom. no structural work. no change to building envelope | $8,000 |
| Jan 31, 2017 | Completed final sign-off Jul 2017 | 278 Randall St | 2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k).Details
2nd floor - interior remodel of (e) kitchen, bearing wall removal and bath addition on 2/f. lighting to comply with cec 150(k). | $60,000 |
| Mar 31, 2015 | Completed final sign-off Jul 2016 | 32 Walter St | work is to comply w/nov 201469491 - selective demolition work after fire - kitchen & baths.Details
work is to comply w/nov 201469491 - selective demolition work after fire - kitchen & baths. | $1,000 |
| Mar 4, 2015 | Completed final sign-off Jul 2016 | 30 Walter St | to comply with nov 201469491. renovation work at 2nd story. no change to building envelope. renovation to create 2 bedroom, 2 bath unit. new windows at rear and side yard not visible from street.Details
to comply with nov 201469491. renovation work at 2nd story. no change to building envelope. renovation to create 2 bedroom, 2 bath unit. new windows at rear and side yard not visible from street. | $100,000 |
| Oct 14, 2014 | Completed final sign-off Jun 2015 | 1032 Junipero Serra Bl | remodel (e) kitchen, add one new bathroom, new family roon on ground floor. remodel (e) bathroom on second floor. construct a new deck at rear (stratford dr. side). relace (e) furnace and water heater.Details
remodel (e) kitchen, add one new bathroom, new family roon on ground floor. remodel (e) bathroom on second floor. construct a new deck at rear (stratford dr. side). relace (e) furnace and water heater. | $40,000 |
| Aug 8, 2014 | Completed final sign-off Jul 2016 | 32 Walter St | remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garageDetails
remodel (e) kitchen, bathroom, bedrooms, living and dining spaces on 3/f remove an(e) bathrm on 3/f. new 4/f stair to 4/f (n) master bedrm, bathrm, closet and sitting rm. mechanical in attic space, boiler in garage | $200,000 |
| Mar 25, 2014 | Completed final sign-off Nov 2014 | 1670 21st Av | 1flr lower floor to create 8 ft ceiling height for family room, siting room, bedroom , bathroom & laundry. 2nd flr, chnage (e) shower to toilet & add lavatory.Details
1flr lower floor to create 8 ft ceiling height for family room, siting room, bedroom , bathroom & laundry. 2nd flr, chnage (e) shower to toilet & add lavatory. | $125,000 |
| Dec 23, 2013 | Completed final sign-off Apr 2014 | 4140 20th St | remodel existing first level kitchen and master bathDetails
remodel existing first level kitchen and master bath | $40,000 |