Mint Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2026 to Oct 2026
- Last 24 months
- 3 permits filed
3 permits since 2000: 2 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 3
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 21, 2026 | In progress issued Oct 2026 | 669 45th Av | 3/f: demo & remove the (e) shower enclosure, shower base & associated fixtures. remove & dispose & install of floor & wall tiles. relocate the (e) toilet to the former shower location, including necessary modifications to water supply, drain & vents. replace the drywall & insulation in all rooms.Details
3/f: demo & remove the (e) shower enclosure, shower base & associated fixtures. remove & dispose & install of floor & wall tiles. relocate the (e) toilet to the former shower location, including necessary modifications to water supply, drain & vents. replace the drywall & insulation in all rooms. | $21,000 |
| Apr 15, 2026 | Completed final sign-off Jun 2026 | 160 Gardenside Dr | unit #402: remodel (e) bathroom in apartment unit. remove (e) tub and replace w/ new shower, inlcuding valve and trim. repace (e) vanity, toilet. remove (e) nonstructural partition wall and install new door. install heated towel rack and electric floor heating. minor plumbing and elec work. newDetails
unit #402: remodel (e) bathroom in apartment unit. remove (e) tub and replace w/ new shower, inlcuding valve and trim. repace (e) vanity, toilet. remove (e) nonstructural partition wall and install new door. install heated towel rack and electric floor heating. minor plumbing and elec work. new | $26,000 |
| Apr 8, 2026 | Completed final sign-off Nov 2026 | 2130 Harrison St | unit 9: remodel existing bathroom in apartment. replace tub to shower, vanity, toilet, tiles. minot electrical and plumbing work to be completed. new water proofing.Details
unit 9: remodel existing bathroom in apartment. replace tub to shower, vanity, toilet, tiles. minot electrical and plumbing work to be completed. new water proofing. | $16,000 |