Back to bathroom remodel contractors
Mino Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2000 to Apr 2008
- Last 24 months
- 0 permits filed
16 permits since 2000: 10 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 295 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2008 | Completed final sign-off Jan 2009 | 135 Marietta Dr | remodel kitchen/upper & lower bath/replace skylights (same size,loc. & weight). replace 5 windows in like kind/plumbing/electrical service (total 24). windows not facing street. no wall removal. lighting changes.Details
remodel kitchen/upper & lower bath/replace skylights (same size,loc. & weight). replace 5 windows in like kind/plumbing/electrical service (total 24). windows not facing street. no wall removal. lighting changes. | $81,000 |
| Aug 13, 2007 | Never finaled issued Aug 2007, no final | 1143 Kansas St | demo bath/ remodel bath & kitchen insulate sheetrock (new service update) no structural changes. (n) kitchen lighting to be fluorescent (n) ba lighting fluorescent or occupancy sensor.Details
demo bath/ remodel bath & kitchen insulate sheetrock (new service update) no structural changes. (n) kitchen lighting to be fluorescent (n) ba lighting fluorescent or occupancy sensor. | $27,000 |
| Jan 13, 2005 | Completed final sign-off Nov 2005 | 265 Francisco St | remodel exist bath&kitchen.no struc wk.repair dryrot at rear.replace 1 dr,3windows also at rear.Details
remodel exist bath&kitchen.no struc wk.repair dryrot at rear.replace 1 dr,3windows also at rear. | $60,000 |