Back to bathroom remodel contractors
Min Constrauction Co
- Based in
- Daly City
- On San Francisco permits
- Dec 2002 to Aug 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 13 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 15, 2010 | Expired or cancelled cancelled Mar 2011 | 2040 Franklin St | unit #1008 - remodel kitchen & bathroom, living, dining & bedroom.Details
unit #1008 - remodel kitchen & bathroom, living, dining & bedroom. | $17,000 |
| Oct 8, 2010 | Completed final sign-off Oct 2010 | 159 Tunnel Av | repair the bathroom and kitchenDetails
repair the bathroom and kitchen | $1,800 |
| Apr 12, 2010 | Completed final sign-off May 2010 | 3826 Fulton St | install 1-hr fire rated sheetrock for garage walls & ceilings. legalize (e) half bathroom in garage, no adding kitchen or bedrooms.comply with his complaint#201039459.Details
install 1-hr fire rated sheetrock for garage walls & ceilings. legalize (e) half bathroom in garage, no adding kitchen or bedrooms.comply with his complaint#201039459. | $6,800 |
| Jan 18, 2008 | Completed final sign-off Jun 2008 | 30 Camellia Av | remodeling the bathroom, master bedroom, kitchen per plan. all work in the second floor.Details
remodeling the bathroom, master bedroom, kitchen per plan. all work in the second floor. | $18,000 |
| Sep 13, 2007 | Completed final sign-off Jan 2008 | 259 Wheeler Av | replace the windwos total 2 wndws not visible from street. no lighting change u value . 67 wndw. remodel the bathroom on 2nd floorDetails
replace the windwos total 2 wndws not visible from street. no lighting change u value . 67 wndw. remodel the bathroom on 2nd floor | $7,000 |
| Mar 9, 2007 | Completed final sign-off May 2007 | 267 London St | bathroom remodel in the attic. install sheetrock for bedrooms. install 5 windows in back of the house. no structural damage.Details
bathroom remodel in the attic. install sheetrock for bedrooms. install 5 windows in back of the house. no structural damage. | $15,000 |