Back to bathroom remodel contractors
Milo Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2026
- Last 24 months
- 4 permits filed
102 permits since 2000: 77 completed, 3 in progress, 8 never finaled, 14 expired or cancelled.
Of the 8 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 12 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2024 | Completed final sign-off Jun 2025 | 939 Innes Av | remodel 2 bathrooms. no change to footprint. replace electrical and plumbing to new. install insulation, sheetrock, fixtures and tiles.Details
remodel 2 bathrooms. no change to footprint. replace electrical and plumbing to new. install insulation, sheetrock, fixtures and tiles. | $30,000 |
| Nov 16, 2022 | Expired or cancelled expired Mar 2025 | 286 Cumberland St | renovate (2) existing bathrooms. replace plumbing, electrical finishes. install new skylight minimum 5-feet away from interior face of exterior wall.Details
renovate (2) existing bathrooms. replace plumbing, electrical finishes. install new skylight minimum 5-feet away from interior face of exterior wall. | $30,000 |
| Dec 30, 2021 | Never finaled issued Dec 2021, no final | 250 Laurel St | replace shower stall tile, replace bathroom floor tile, install new vanity and sink. install shower pan.Details
replace shower stall tile, replace bathroom floor tile, install new vanity and sink. install shower pan. | $20,000 |
| Sep 24, 2019 | Completed final sign-off Feb 2020 | 674 Alvarado St | 2nd floor: remodel bathroom: fixtures to remain in same location, new tiles, new fixtures. 7x6 approxDetails
2nd floor: remodel bathroom: fixtures to remain in same location, new tiles, new fixtures. 7x6 approx | $20,000 |
| Jun 2, 2017 | Never finaled issued Jun 2017, no final | 428 Elizabeth St | renovation of e bath, conversion of e closet into new 1/2 bathDetails
renovation of e bath, conversion of e closet into new 1/2 bath | $10,000 |
| Jul 24, 2014 | Completed final sign-off Sep 2014 | 340 Joost Av | remodel 2nd floor bathroom. remove & replace sheetrock and replace flooring. fixtures to remain. install insulation, sheetrock, tile and new fixtures.Details
remodel 2nd floor bathroom. remove & replace sheetrock and replace flooring. fixtures to remain. install insulation, sheetrock, tile and new fixtures. | $20,000 |
| Jul 24, 2014 | Completed final sign-off Jan 2015 | 869 Church St | remodel 2nd floor bathroom, remove sheetrock to stud walls. remove flooring. fixtures to remain. install sheetrock, insulation, tile and new fixtures.Details
remodel 2nd floor bathroom, remove sheetrock to stud walls. remove flooring. fixtures to remain. install sheetrock, insulation, tile and new fixtures. | $20,000 |
| Jul 24, 2013 | Completed final sign-off Jan 2014 | 164 Maywood Dr | remodeling kitchen on main level and bathroom on top level including replacing cabinets, counter tops, tiles and plumbing & electrical fixtures. no change in walls & opening layout. 50% kitchen lighing wattage shall be he or controlled by manuel sensor.Details
remodeling kitchen on main level and bathroom on top level including replacing cabinets, counter tops, tiles and plumbing & electrical fixtures. no change in walls & opening layout. 50% kitchen lighing wattage shall be he or controlled by manuel sensor. | $21,000 |
| May 20, 2013 | Completed final sign-off Dec 2013 | 123 Ulloa St | (e) bathroom renovation, renovation of (e) family room. addition of new full bathroom & laundry roomDetails
(e) bathroom renovation, renovation of (e) family room. addition of new full bathroom & laundry room | $60,000 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 18 Otsego Av | remodel 2/f bathroom, size of bathroom not to increase or decrease. fixtures to remain, new tile and sheetrock.Details
remodel 2/f bathroom, size of bathroom not to increase or decrease. fixtures to remain, new tile and sheetrock. | $12,000 |
| Jan 19, 2005 | Completed final sign-off Jul 2005 | 222 Wawona St | kitchen & bath remodel. no walls to be movedDetails
kitchen & bath remodel. no walls to be moved | $40,000 |
| Jul 23, 2003 | Completed final sign-off Nov 2004 | 2667 Clay St | enlarging bedroom & bathroom to 2nd flr. relocating 2 doors to 2nd fl.removing shingles and replaceDetails
enlarging bedroom & bathroom to 2nd flr. relocating 2 doors to 2nd fl.removing shingles and replace | $35,000 |
| Apr 28, 2003 | Completed final sign-off Sep 2003 | 120 Juanita Wy | kitchen & bath remodel on first floorDetails
kitchen & bath remodel on first floor | $30,000 |
| Oct 18, 2002 | Completed final sign-off Oct 2002 | 2659 22nd St | revision to 200106222210 to interior partitions, enlarge bathroom garage level, reduce and reviseDetails
revision to 200106222210 to interior partitions, enlarge bathroom garage level, reduce and revise | |
| Apr 9, 2001 | Completed final sign-off Aug 2001 | 3782 24th St | add 1/2 bath & washer/dryer closet in residential unit (2nd flr only)Details
add 1/2 bath & washer/dryer closet in residential unit (2nd flr only) | $6,000 |