Millstreet Builders
- Based in
- Novato
- On San Francisco permits
- Feb 2003 to Jul 2022
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 expired or cancelled. Typically 371 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 9, 2021 | Expired or cancelled expired Dec 2024 | 2390 Hyde St | replace e deck railing with new glass railing patch or replace e siding replace e sliding glass door to e balcony on north side with new door. replace e windows on e side of either side of fireplace.lower sill height to align with e door no .relace w indow new window 15,lower sill height to align wDetails
replace e deck railing with new glass railing patch or replace e siding replace e sliding glass door to e balcony on north side with new door. replace e windows on e side of either side of fireplace.lower sill height to align with e door no .relace w indow new window 15,lower sill height to align w | $15,000 |