Mike Langton Const
- Based in
- Concord
- On San Francisco permits
- Oct 2012 to Oct 2012
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 4, 2012 | Completed final sign-off Oct 2012 | 769 Elizabeth St | (reroof only) ..must remove roof layers to expose rafters that need to be repaired or replaced on other permit. ridgevent - 30 lb felt lifetime class a roof and after other work approvedDetails
(reroof only) ..must remove roof layers to expose rafters that need to be repaired or replaced on other permit. ridgevent - 30 lb felt lifetime class a roof and after other work approved | $12,500 |
| Oct 4, 2012 | Completed final sign-off Oct 2012 | 769 Elizabeth St | remove 4 roofs to expose rafters and skip sheeting. install 2x6 rafters at 24 inches on center. install legs and bracings as per drawings require.Details
remove 4 roofs to expose rafters and skip sheeting. install 2x6 rafters at 24 inches on center. install legs and bracings as per drawings require. | $12,500 |