Back to bathroom remodel contractors
Mike Endres Design & Construction
- Based in
- Richmond Annex
- On San Francisco permits
- Mar 2004 to Jun 2010
- Last 24 months
- 0 permits filed
7 permits since 2000: 4 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 319 days from filing to permit and 42 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2008 | Expired or cancelled cancelled Feb 2011 | 143 Collingwood St | 3rd floor addition and entire remodel, lateral strengthening , ground floor:add new unit w/ bedroom,lvg room,full bath, kitchen, new side entry/stair,new windows,convert crawl space into storage, rear deck/stair. 2nd fl: change front windows to fr doors w/rail, remodel kitchen, new family rm/pwder,Details
3rd floor addition and entire remodel, lateral strengthening , ground floor:add new unit w/ bedroom,lvg room,full bath, kitchen, new side entry/stair,new windows,convert crawl space into storage, rear deck/stair. 2nd fl: change front windows to fr doors w/rail, remodel kitchen, new family rm/pwder, | $100,000 |
| May 28, 2004 | Completed final sign-off Jul 2004 | 255 Sanchez St | bathroom remodel.no structure work.repl shower, tile, pressure balance shower valve,lino&underlaymenDetails
bathroom remodel.no structure work.repl shower, tile, pressure balance shower valve,lino&underlaymen | $10,000 |