Michael P. O'neill
- Based in
- San Francisco
- On San Francisco permits
- Jul 2011 to Mar 2020
- Last 24 months
- 0 permits filed
35 permits since 2000: 32 completed, 3 never finaled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2020 | Completed final sign-off Jan 2021 | 629 Arguello Bl | unit #107: new kitchen cabinets & countertops & appliances. new wood moldings (baseboard & screen) bathroom vanities fixtures & tub bathDetails
unit #107: new kitchen cabinets & countertops & appliances. new wood moldings (baseboard & screen) bathroom vanities fixtures & tub bath | $23,000 |
| Mar 13, 2020 | Completed final sign-off Apr 2022 | 880 Franklin St | unit #309: new kitchen cabinets & countertops & appliances. new wood moldings (baseboard & crown moldings). new bathroom vanity fixtures & tubDetails
unit #309: new kitchen cabinets & countertops & appliances. new wood moldings (baseboard & crown moldings). new bathroom vanity fixtures & tub | $25,000 |
| Jul 10, 2019 | Completed final sign-off Oct 2019 | 1445 Greenwich St | unit # 402: new door & moldings. new kitchen cabinets, countertops & appliances. 2 bathroom remodels to include new tub, shower stall, vanites and countertops. no new walls openings.Details
unit # 402: new door & moldings. new kitchen cabinets, countertops & appliances. 2 bathroom remodels to include new tub, shower stall, vanites and countertops. no new walls openings. | $26,000 |
| May 29, 2019 | Never finaled issued May 2019, no final | 629 Arguello Bl | removal and replacement of approx 50 sq ft of sheathing dry rot. all work non street facing.Details
removal and replacement of approx 50 sq ft of sheathing dry rot. all work non street facing. | $5,000 |
| May 13, 2019 | Completed final sign-off Jul 2019 | 923 Eddy St | #107: new kitchen cabs & counter tops. new doors moldings. new bath tub fixtures vanity. no new wall openings.Details
#107: new kitchen cabs & counter tops. new doors moldings. new bath tub fixtures vanity. no new wall openings. | $24,000 |
| Dec 3, 2018 | Completed final sign-off Feb 2019 | 1445 Greenwich St | all work in unit #406. new kitchen cabinets, countertop, new bathroom tile, vanity and countertop. new interior doors, new baseboard, window trim and crown molding. no new openings. all interior work only.Details
all work in unit #406. new kitchen cabinets, countertop, new bathroom tile, vanity and countertop. new interior doors, new baseboard, window trim and crown molding. no new openings. all interior work only. | $20,000 |
| May 30, 2018 | Completed final sign-off Aug 2018 | 629 Arguello Bl | #208: kitchen & bath remodel. new kitchen cabinets, countertop, new appliances. new tub, toilet, tile & vanity & countertop. new doors, mirrors, baseboard, crown holdings. no new wall openings or moveing of existing walls.Details
#208: kitchen & bath remodel. new kitchen cabinets, countertop, new appliances. new tub, toilet, tile & vanity & countertop. new doors, mirrors, baseboard, crown holdings. no new wall openings or moveing of existing walls. | $25,000 |
| Apr 2, 2018 | Completed final sign-off Jun 2018 | 1445 Greenwich St | new kitchen cabinets, countertops. new doors, baseboard, moldings. new bathtub, vanity and sink w/ new tiles. no new wall openings, revoal or alterations. maher n/aDetails
new kitchen cabinets, countertops. new doors, baseboard, moldings. new bathtub, vanity and sink w/ new tiles. no new wall openings, revoal or alterations. maher n/a | $25,000 |
| Feb 12, 2018 | Completed final sign-off Apr 2018 | 629 Arguello Bl | unit 106: new kitchen cabinets, appliances, interior doors, crown moulding/baseboards, tubs, tile, toilet, vanity, mirror; no structural work, no new walls/openings to be ereceted/removed.Details
unit 106: new kitchen cabinets, appliances, interior doors, crown moulding/baseboards, tubs, tile, toilet, vanity, mirror; no structural work, no new walls/openings to be ereceted/removed. | $25,000 |
| Feb 12, 2018 | Completed final sign-off May 2018 | 1445 Greenwich St | units 305: new kitchen cabinets, appliances, interior doors, crown moulding/baseboards, tubs, tile in bath to include vanity, mirror; no structural work, no new walls/openings to be ereceted/removed.Details
units 305: new kitchen cabinets, appliances, interior doors, crown moulding/baseboards, tubs, tile in bath to include vanity, mirror; no structural work, no new walls/openings to be ereceted/removed. | $25,000 |
| Nov 16, 2017 | Completed final sign-off Feb 2018 | 1445 Greenwich St | kitchen and bath remodel at units #104 & #304. kitchen and (2) baths remodel at units #102 and #403. new cabinets , countertops, interior doors, wood trim, baseboard , crown moldings, window trim, bath vanity, new appliances. 4 units total. no wall changes or alterations. maher n/aDetails
kitchen and bath remodel at units #104 & #304. kitchen and (2) baths remodel at units #102 and #403. new cabinets , countertops, interior doors, wood trim, baseboard , crown moldings, window trim, bath vanity, new appliances. 4 units total. no wall changes or alterations. maher n/a | $60,000 |
| Sep 1, 2017 | Completed final sign-off Jan 2018 | 1445 Greenwich St | removal of existing shingles 2200 sq ft. removal & replacement of all dry rot est 300 sq ft. install new hardiback hnorizontal siding. (not visible from street)Details
removal of existing shingles 2200 sq ft. removal & replacement of all dry rot est 300 sq ft. install new hardiback hnorizontal siding. (not visible from street) | $25,000 |
| Apr 23, 2015 | Never finaled issued Apr 2015, no final | 923 Eddy St | unit # 201: fire rated assemblies to be maintained. new kitchen cabinets, countertops, tile and appliances. new bath vanity, countertop, tile and tub + fixtures, new crown molding, baseboard & window trim. replce (2) interior existing doors - no new wall openings - no new ductwork. no structural.Details
unit # 201: fire rated assemblies to be maintained. new kitchen cabinets, countertops, tile and appliances. new bath vanity, countertop, tile and tub + fixtures, new crown molding, baseboard & window trim. replce (2) interior existing doors - no new wall openings - no new ductwork. no structural. | $35,000 |
| Apr 23, 2015 | Completed final sign-off Jul 2015 | 1445 Greenwich St | unit #209: fire rated assemblies to be maintained. new kitchen cabinets, countertops, tile, new bath, new appliances, vanity, countertop, tile, new crown molding, baseboard & window trim. replce (2) interior doors in kind - no new wall openings - no new ductwork. no structural.Details
unit #209: fire rated assemblies to be maintained. new kitchen cabinets, countertops, tile, new bath, new appliances, vanity, countertop, tile, new crown molding, baseboard & window trim. replce (2) interior doors in kind - no new wall openings - no new ductwork. no structural. | $35,000 |
| Mar 26, 2015 | Never finaled issued Mar 2015, no final | 923 Eddy St | work in unit 108: new hardwood floors living room shall replace int. doors (2), new baseboard, crown moldings and window trim. new kitchen cabinets, countertops, appliances, 1 bath woith new tile, tub, vanity/countertop. no new wall opening. no ducts.Details
work in unit 108: new hardwood floors living room shall replace int. doors (2), new baseboard, crown moldings and window trim. new kitchen cabinets, countertops, appliances, 1 bath woith new tile, tub, vanity/countertop. no new wall opening. no ducts. | $25,000 |
| Mar 26, 2015 | Completed final sign-off Jun 2015 | 1445 Greenwich St | unit #208. replace interior doors(4), new baseboard, crown molding & window trim. new kitchen cabinets, counter tops & appliances (9x7). 2 bath, new tub, tile vanity & counter top (40sq ft0. no new wall openings. no new ductwork, unit 308 - same as above.Details
unit #208. replace interior doors(4), new baseboard, crown molding & window trim. new kitchen cabinets, counter tops & appliances (9x7). 2 bath, new tub, tile vanity & counter top (40sq ft0. no new wall openings. no new ductwork, unit 308 - same as above. | $80,000 |
| Jan 29, 2015 | Completed final sign-off Jun 2015 | 1445 Lake St | unit 304 - new kitchen cabinets & countertops, replace existing 5 doors, new interior windwo trim moldings & baseboards, new bath vanity cabinet & countertop at 2 bathrooms. no new all openings, no new ductworkDetails
unit 304 - new kitchen cabinets & countertops, replace existing 5 doors, new interior windwo trim moldings & baseboards, new bath vanity cabinet & countertop at 2 bathrooms. no new all openings, no new ductwork | $13,000 |
| Jan 29, 2015 | Completed final sign-off Apr 2015 | 923 Eddy St | unit 205 - new kitchen cabinets, countertops, replace 5 interior doors, new interior window trim, moldings & baseboard, new bath vanity cabinets & counter tops at 2 bathrooms, new plywood overlay, no new wall openings, no new ductworkDetails
unit 205 - new kitchen cabinets, countertops, replace 5 interior doors, new interior window trim, moldings & baseboard, new bath vanity cabinets & counter tops at 2 bathrooms, new plywood overlay, no new wall openings, no new ductwork | $13,000 |
| May 22, 2014 | Completed final sign-off Feb 2015 | 923 Eddy St | new kitchen cabs & counter tops, new bath-tub, vanity, tile counter top, new wood molding, new wood doors, 1 new electrical outlet to be added in kitchen at (2) units #202 & #305 only. no new wall openings - no new ductwork, total of 2 kitchens & 3 bathrooms & 6 doors.Details
new kitchen cabs & counter tops, new bath-tub, vanity, tile counter top, new wood molding, new wood doors, 1 new electrical outlet to be added in kitchen at (2) units #202 & #305 only. no new wall openings - no new ductwork, total of 2 kitchens & 3 bathrooms & 6 doors. | $30,000 |
| Mar 4, 2014 | Completed final sign-off Jun 2014 | 629 Arguello Bl | unit 104, 204, 207 new kitchen cabinets, countertops, new tub, vanity & counter . top in bath, new baseboard, crown moldings & window moldings, new carpet, 1 additional electrical plug in kichen, no new duct work ne new wall openings.Details
unit 104, 204, 207 new kitchen cabinets, countertops, new tub, vanity & counter . top in bath, new baseboard, crown moldings & window moldings, new carpet, 1 additional electrical plug in kichen, no new duct work ne new wall openings. | $24,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 923 Eddy St | unit #306-new kitchen cabinets & counter tops, new appliances, new lighting fixtures & new bathroom fixtures, vanity. new doors & mouldings. no new walls openings or ductworkDetails
unit #306-new kitchen cabinets & counter tops, new appliances, new lighting fixtures & new bathroom fixtures, vanity. new doors & mouldings. no new walls openings or ductwork | $24,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 923 Eddy St | unit #106-new kitchen cabinets & counter tops, new appliances, new lighting fixtures & new bathroom fixtures, vanity. new doors & mouldings, new hardwood floors. no new walls openings or ductworkDetails
unit #106-new kitchen cabinets & counter tops, new appliances, new lighting fixtures & new bathroom fixtures, vanity. new doors & mouldings, new hardwood floors. no new walls openings or ductwork | $24,000 |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 1445 Greenwich St | #205- kitchen & 1 bath -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork.Details
#205- kitchen & 1 bath -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork. | $18,000 |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 1445 Greenwich St | #206- kitchen & 1 bath -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork.Details
#206- kitchen & 1 bath -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork. | $18,000 |
| Oct 5, 2012 | Completed final sign-off Dec 2012 | 923 Eddy St | #207-kitchen, 1 bath -replace kitchen cabinets, counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures,baseboard heater, new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork.Details
#207-kitchen, 1 bath -replace kitchen cabinets, counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures,baseboard heater, new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork. | $18,000 |
| Oct 5, 2012 | Completed final sign-off Mar 2013 | 1445 Greenwich St | #407- kitchen & 2 baths -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork.Details
#407- kitchen & 2 baths -replace kitchen cabinets & counter tops, replace 2 interior doors, replace tub, tile, vanity & mirrors, replace plugs gfi's lighting fixtures, install new crown moldings, baseboard & window trim, replacement in kind, same location, no new wall openings, no new ductwork. | $23,000 |
| Oct 2, 2012 | Completed final sign-off Dec 2012 | 923 Eddy St | work in unit 101: replace kitchen cabinets,, new baseboard crown moldings, window trim. replace interior doors(2), replace tub,tile,vanity,mirrors,lighting fixtures,plugs,gfi all replacement inkind,same location.comply cec 150(k)8,10 no new wall opening, no new duct workDetails
work in unit 101: replace kitchen cabinets,, new baseboard crown moldings, window trim. replace interior doors(2), replace tub,tile,vanity,mirrors,lighting fixtures,plugs,gfi all replacement inkind,same location.comply cec 150(k)8,10 no new wall opening, no new duct work | $14,000 |
| Sep 11, 2012 | Completed final sign-off Oct 2012 | 1445 Greenwich St | apt. # 107: new kitchen cabinets and countertops, new doors (4) new crown molding, baseboard and window trim 52 sq. ft. (2) bath - new tubs, lavatorys, countertops, vanities, mirrors and tile. 5'x8' each. no new wall openings or duct work.Details
apt. # 107: new kitchen cabinets and countertops, new doors (4) new crown molding, baseboard and window trim 52 sq. ft. (2) bath - new tubs, lavatorys, countertops, vanities, mirrors and tile. 5'x8' each. no new wall openings or duct work. | $14,500 |
| Jun 25, 2012 | Completed final sign-off Aug 2012 | 629 Arguello Bl | #307-remodel one ktichen,one bath -new kitchen countertops,cabients & appliances, new crown moldings & baseboard, new bath tiles, vanity, countertop, mirrors,tub. installed lighting min 50% total wattage high efficacy @ kitchen. high efficacy or manual on occupancy sensors @bath.no new wall,openingsDetails
#307-remodel one ktichen,one bath -new kitchen countertops,cabients & appliances, new crown moldings & baseboard, new bath tiles, vanity, countertop, mirrors,tub. installed lighting min 50% total wattage high efficacy @ kitchen. high efficacy or manual on occupancy sensors @bath.no new wall,openings | $18,000 |
| Feb 21, 2012 | Completed final sign-off Mar 2012 | 629 Arguello Bl | work in unit 206: new kitchen countertops, cabinets and appliances. new crown moldings and baseboard. new bathroom tiles, vanity countertop, mirror, tub. no new wall openings or structural alterations.Details
work in unit 206: new kitchen countertops, cabinets and appliances. new crown moldings and baseboard. new bathroom tiles, vanity countertop, mirror, tub. no new wall openings or structural alterations. | $18,000 |
| Jan 9, 2012 | Completed final sign-off Feb 2012 | 923 Eddy St | unit #308-new kitchen cabinets, countertops, fixtures, new bathroom tiles, vanities, mirrors, lighting fixtures. new interior doors baseboards & crown moldings. no window, door, wall or ceiling alterations. no exterior workDetails
unit #308-new kitchen cabinets, countertops, fixtures, new bathroom tiles, vanities, mirrors, lighting fixtures. new interior doors baseboards & crown moldings. no window, door, wall or ceiling alterations. no exterior work | $18,000 |
| Oct 11, 2011 | Completed final sign-off Nov 2011 | 923 Eddy St | new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes).Details
new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes). | $12,500 |
| Oct 11, 2011 | Completed final sign-off Jan 2012 | 629 Arguello Bl | new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes).Details
new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes). | $14,000 |
| Oct 11, 2011 | Completed final sign-off Dec 2011 | 1445 Greenwich St | new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes).Details
new kitchen cabinets, counter tops & fixtures. new bath tiles, vanities & mirrors, lighting fixtures, new interior doors baseboard & crown moldings. no window, door, or wall, ceiling alteration. (except as notes). | $12,500 |
| Jul 18, 2011 | Completed final sign-off Oct 2011 | 923 Eddy St | new kitchen cabinets & bathrm vanities. new interior doors, approx 300sq ft of hardwd floors, new baseboards, crown moulding, new countertops ktichen & bathrm, 6 new sinks kitchen & bathrm. new tile kitchen & bathrm. kitchen at least 50% high eff he lighting, bathrm he or occupancy sensor, cec (k)Details
new kitchen cabinets & bathrm vanities. new interior doors, approx 300sq ft of hardwd floors, new baseboards, crown moulding, new countertops ktichen & bathrm, 6 new sinks kitchen & bathrm. new tile kitchen & bathrm. kitchen at least 50% high eff he lighting, bathrm he or occupancy sensor, cec (k) | $12,500 |