Back to bathroom remodel contractors
Michael Lo Const.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Jun 2005
- Last 24 months
- 0 permits filed
11 permits since 2000: 6 completed, 1 never finaled, 4 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 86 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2005 | Expired or cancelled expired Mar 2010 | 155 San Rafael Wy | repair 2 leaking windows,upper & lower bathrooms,cut stucco and install flashing (metal)Details
repair 2 leaking windows,upper & lower bathrooms,cut stucco and install flashing (metal) | $900 |
| Feb 15, 2005 | Completed final sign-off May 2005 | 144 Beaver St | to comply with 3-r report, inspect kitchens & bathrooms, and fire place.Details
to comply with 3-r report, inspect kitchens & bathrooms, and fire place. | $1,000 |
| Mar 1, 2004 | Completed final sign-off Jul 2004 | 1350 Francisco St | retile tub surround & retile floor (bath room) new kitchen sink and couinter top no structural workDetails
retile tub surround & retile floor (bath room) new kitchen sink and couinter top no structural work | $7,000 |