Back to bathroom remodel contractors
Michael James Const
- Based in
- Walnut Creek
- On San Francisco permits
- Jul 2000 to Aug 2012
- Last 24 months
- 0 permits filed
61 permits since 2000: 41 completed, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 24, 2010 | Completed final sign-off Nov 2010 | 132 Moffitt St | add bathroom to utility room - toielt, sink, shower, bathtub window on ground floor.Details
add bathroom to utility room - toielt, sink, shower, bathtub window on ground floor. | $9,000 |
| Aug 21, 2006 | Completed final sign-off Nov 2006 | 873 Vallejo St | remodel 1 full bath and 1 pwder room . new shower, sink, toilet, new sink and toilet powder roomDetails
remodel 1 full bath and 1 pwder room . new shower, sink, toilet, new sink and toilet powder room | $21,500 |
| Jun 28, 2006 | Completed final sign-off Mar 2007 | 305 Frederick St | work includes interior remodel of two (e) aprtments with new bathrooms, kitchen, finishes, and electrical work. building will also be re-roofed (801 clayton st. #3, 305 frederick). two bedrooms in 305 frederick become part of 801 clayton #3 apt. new skylights in (e) baysDetails
work includes interior remodel of two (e) aprtments with new bathrooms, kitchen, finishes, and electrical work. building will also be re-roofed (801 clayton st. #3, 305 frederick). two bedrooms in 305 frederick become part of 801 clayton #3 apt. new skylights in (e) bays | $43,500 |
| May 12, 2003 | Expired or cancelled expired Mar 2005 | 2418 Webster St | replace foundation in lower fl. section of basement excavate to 8'1" install new walls, bathroom,Details
replace foundation in lower fl. section of basement excavate to 8'1" install new walls, bathroom, | $50,000 |
| Mar 26, 2003 | Completed final sign-off Aug 2003 | 801 Clayton St | remodel kitchen/bath, new cabinets, counter tops, flooring,sink,shwr,toilet, elec svc,drywallDetails
remodel kitchen/bath, new cabinets, counter tops, flooring,sink,shwr,toilet, elec svc,drywall | $20,000 |
| Jan 24, 2003 | Completed final sign-off May 2003 | 1516 36th Av | remodel 2 bathrooms. new tub, shower sink toilet, drywall, electrical, exhaust fan, tileDetails
remodel 2 bathrooms. new tub, shower sink toilet, drywall, electrical, exhaust fan, tile | $50,000 |
| Jan 23, 2002 | Completed final sign-off Apr 2002 | 803 Clayton St | #2- remodel kitchen & bath, no structural workDetails
#2- remodel kitchen & bath, no structural work | $10,000 |
| May 1, 2001 | Completed final sign-off Feb 2002 | 123 Raccoon Dr | remodel whole house, 3 baths, 1st floor, keep sink in 1st fl study, new windows face st, improve grnDetails
remodel whole house, 3 baths, 1st floor, keep sink in 1st fl study, new windows face st, improve grn | $350,000 |
| Oct 5, 2000 | Completed final sign-off Dec 2000 | 435 Frederick St | kitchen remodel, replace furnace, repair bath, new tubDetails
kitchen remodel, replace furnace, repair bath, new tub | $25,000 |
| Jul 28, 2000 | Completed final sign-off Feb 2001 | 368 Sanchez St | remodel bathroom , new tub, sink,toilet, drywall, ceramic tileDetails
remodel bathroom , new tub, sink,toilet, drywall, ceramic tile | $25,000 |